BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2022 at 7:00 PM

Updated November 15, 2023

Site work and asbestos abatement for an educational facility in Davison, Michigan. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.

Davison Community Schools will be receiving sealed bids for AsbesDavison Community Schools will be receiving sealed bids for Asbestos Abatement for Summer 2022 Renovations at Davison High School. This project will be completed in June and July 2022, prior to building renovation activities and will include the removal and disposal of asbestos ceilings, asbestos troweled on ceiling plaster, asbestos spray-on fireproofing and asbestos thermal system insulation materials. All bids shall be accompanied by a sworn statement, in accordance with MCL 380.1267, disclosing any familial relationship that exists between the owner(s) or any employee of the bidder and any member of the Board of Education of the School District or the Superintendent of the School District. All bids shall be accompanied by a sworn statement, in accordance with MCL 129.313, certifying that the bidder is not an Iran linked business. The Board of Education shall not accept a bid that does not include sworn and notarized copies of the familial relationship disclosure statement and affidavit of compliance with the Iran Sanction Act. Davison Community Schools reserves the right to reject any or all bids either in whole or in part or to waive any informalities or irregularities that may be in the best interest of the School District. The first and only project group for abatement at Davison High School includes the removal of all asbestos lay-in ceiling tiles and associated grid work, all asbestos plaster ceilings, all asbestos drywall ceilings, all asbestos spray-on fireproofing insulation, all asbestos straight pipe insulation with asbestos fittings and all asbestos pipe fitting insulation with fiberglass lines from throughout the project group work area. The project will include, but is not limited to, 1st floor Media Center, Classrooms and Corridor work areas at Davison High School. This project at Davison High School will involve a single negative pressure enclosure to remove the ceiling materials, asbestos spray-on fireproofing materials and asbestos thermal system insulation materials using Class I removal procedures. The project will begin on Saturday, June 18, 2022, and will be complete with all abatement activities and ready for TEM clearance sampling by the end of the day on Monday, July 11, 2022. The project schedule allows for a total of twenty-one (21) work days (Saturday, Monday-Sunday, Monday-Sunday, Wednesday-Sunday, Monday) to complete the project, with additional time allotted for tear down activities.

Award

Educational

$608,000.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
128
Bidding Soon
2,267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

June 18, 2022

Project location map

1250 N Oak Rd, Davison, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.