Published January 26, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Newport Beach, California. Completed plans call for site work for a water / sewer project.

The work necessary for the completion of this contract consists of: 1. Mobilization of equipment and personnel to the well site. 2. Disconnecting the piping & electrical systems from the well and removing the motor, pump column and pump bowls from the well. Inspect the condition of the pump system. City staff will handle all electrical disconnections from the permanent motor. Permanent motor may be stored on-site inside the pump house on a pallet supplied by Contractor. 3. Initially conduct wire-brushing and bailing of sediment fill from the bottom of the well. Use a hydrogen peroxide solution to help remove encrusting material from the casing walls. 4. Conduct an initial video survey of the entire well casing. 5. Perform "Air-Jetting" of the well to help dislodge and loosen any material from the perforations and the gravel pack around the well. 6. Conduct chemical treatment of the well using HerChemTec solutions. Add additional chemical treatment with acid 7. Perform mechanical re-development via simultaneously swabbing and airlifting of the chemical solutions from the well. Fluids generated during this process shall be treated prior to discharge to the local storm drain system. 8. Mobilize, install, operate, maintain and then remove a temporary test pump and test motor capable of pumping up to 2,300 gpm. 9. Conduct pumping development by pumping and surging. 10. Conduct a 12-hour step-drawdown test and a 24- to 48-hour constant rate pumping test. 11. Near the end of the constant rate pumping test, perform a dynamic spinner survey in the well. 12. Remove the test pump and disinfect the well. 13. Re-install the new pump components in the well and conduct vibration testing, and trim balance, followed by a 72-hour pumping test at the design rate. Disinfect the pump components during installation. 14. Perform well chlorination and clean up the well site. Liquidated Damages : $2,000 Per Day Estimated Bid Value : $350,000.00 Project Duration : 45 Consecutive Working Days Bid Bond : 10.00% Payment Bond : 100.00% Performance Bond : 100.00% Please note that line item #18 is now set to a fixed price. This line now matches what is in the Special Provisions.

Award

Water / Sewer

$331,678.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
2
Bidding Soon
2,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2021

January 31, 2022

Project location map

Multiple Locations, Newport Beach, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.