Published January 26, 2022 at 7:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Newport Beach, California. Completed plans call for site work for a water / sewer project.
The work necessary for the completion of this contract consists of: 1. Mobilization of equipment and personnel to the well site. 2. Disconnecting the piping & electrical systems from the well and removing the motor, pump column and pump bowls from the well. Inspect the condition of the pump system. City staff will handle all electrical disconnections from the permanent motor. Permanent motor may be stored on-site inside the pump house on a pallet supplied by Contractor. 3. Initially conduct wire-brushing and bailing of sediment fill from the bottom of the well. Use a hydrogen peroxide solution to help remove encrusting material from the casing walls. 4. Conduct an initial video survey of the entire well casing. 5. Perform "Air-Jetting" of the well to help dislodge and loosen any material from the perforations and the gravel pack around the well. 6. Conduct chemical treatment of the well using HerChemTec solutions. Add additional chemical treatment with acid 7. Perform mechanical re-development via simultaneously swabbing and airlifting of the chemical solutions from the well. Fluids generated during this process shall be treated prior to discharge to the local storm drain system. 8. Mobilize, install, operate, maintain and then remove a temporary test pump and test motor capable of pumping up to 2,300 gpm. 9. Conduct pumping development by pumping and surging. 10. Conduct a 12-hour step-drawdown test and a 24- to 48-hour constant rate pumping test. 11. Near the end of the constant rate pumping test, perform a dynamic spinner survey in the well. 12. Remove the test pump and disinfect the well. 13. Re-install the new pump components in the well and conduct vibration testing, and trim balance, followed by a 72-hour pumping test at the design rate. Disinfect the pump components during installation. 14. Perform well chlorination and clean up the well site. Liquidated Damages : $2,000 Per Day Estimated Bid Value : $350,000.00 Project Duration : 45 Consecutive Working Days Bid Bond : 10.00% Payment Bond : 100.00% Performance Bond : 100.00% Please note that line item #18 is now set to a fixed price. This line now matches what is in the Special Provisions.
Award
Water / Sewer
$331,678.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
21
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.