BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2021 at 7:00 PM

Updated September 14, 2023

Site work and renovation of a civil project in Arlington, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work includes, but is not limited to, the following: 1. Rehabilitation of the existing four (4) cell concrete gravity filter to include: a. Replacement of existing filter media b. Replacement of existing filter underdrain nozzles c. Surface preparation and painting of interior concrete filter cells d. Replacement of existing valves 2. Furnish and install new air wash blower. 3. Furnish and install new duplex air compressor. 4. Furnish and install new chemical feed systems for chlorine gas, fluoride, polyphosphate, sodium permanganate and other miscellaneous chemical feed improvements. 5. Replacement of process valves, actuators, and flow meters. 6. Miscellaneous electrical, controls, and HVAC improvements. 7. Surface preparation and painting of existing process piping, tanks, and interior building components. 8. Replacement of two (2) submersible backwash waste pumps. 9. Miscellaneous demolition work associated with the rehabilitation work described above. Together with numerous related items of work, all in accordance with the Plans and Specifications. COMPLETION OF WORK: All work under the Contract must be complete by 350 calendar days. A Proposal Bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of City of Arlington, Minnesota shall accompany each bid. The Bidder shall have experience as a General Contractor in the successful completion of at least two (2) municipal water treatment plants within the last five (5) years. The successful Bidder will be required to furnish a Performance Bond and Labor and Materials Payment Bond each in the amount of the Contract. All questions relative to this project prior to the opening of bids shall be directed to the Engineer/Manager of the project. It shall be understood, however, that no specification interpretations will be made by telephone. Address inquiries to: Bolton & Menk, Inc. Attn: Jake Pichelmann, P.E. 3507 High Point Dr. N. Bldg. 1 - Suite E130 Oakdale, MN 55128 Telephone: (651) 704-9970 ext. 2867 Fax: (651) 704-9971 Email: jakeb.pichelmann@bolton-menk.com OWNER'S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.

Bid Results

Water / Sewer

$1,631,900.00

Public - City

Renovation, Site Work

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
133
Bidding Soon
1,391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

February 14, 2022

Project location map

To Be Determined, Arlington, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.