BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Bridgeport, Washington. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

The construction of Upper Pearl Hill Bridge Replacement", consisting of removing the existing steel and timber bridge and by constructing a prestressed concrete girder bridge, excavation and reconstruction of the existing roadway and stream channel, grading. HMA pavement, storm drains, guardrail, pavement marking, temporary stream diversion, dewatering, temporary erosion and sediment control, and new guide walls comprised of structural earth walls," and other work. A bid bond in the amount of 5% of the bid shall accompany all bids "The Douglas County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252. 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be dis criminated against on the grounds of race, color, or national origin in consideration for an award. Bidders are advised to read all pertinent provisions regarding the submittal of DBE documentation The Board of County Commissioners reserves the right to reject any or all bids for cause *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 2200024, 2022-022-21 consisting of removing the existing steel and timber bridge and by constructing a prestressed concrete girder bridge, excavation and reconstruction of the existing roadway and stream channel, grading, HMA pavement, storm drains, guardrail, pavement marking, temporary stream diversion, dewatering, temporary erosion and sediment control, and new guide walls comprised of structural earth walls. The Board of County Commissioners will open sealed bids and publicly read them aloud on Monday, June 10, 2024 at 10:00:59 A.M. Pacific Time

Award

Bridges / Tunnels

$2,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

30

3

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
9
Bidding Soon
266
All Active Projects
78
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 10, 2024

August 9, 2024

December 27, 2024

img_map_placeholder

Pearl Hill Rd NE, Bridgeport, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.