BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.

Contractor shall furnish and install two vertical pedestal mount non-clog centrifugal pumps with associated appurtenances; furnish and install new bolts and rubber gaskets; demolish and remove existing steel motor bases, concrete pump bases and appurtenances; construct new concrete bases for pumps; and startup system. Q & A deadline: Apr 20, 2022 3:00:00 PM MDT Required Vendor Qualifications DRUG FREE , SCRUTINZED, PUBLIC ENTITY CRIME STATEMENT, NON-COLLUSIVE AFFIDAVIT. Work in this Section includes all labor, material, equipment, testing, tax, overhead, and profit necessary to install, construct, and place into service the items described in this Section to provide a complete and functional system ready for use by the City. B. The Contractor shall obtain Substantial Completion within 190 calendar days from the Notice to Proceed, with the Final Completion of all Work within the Contract Time of 220 calendar days from the Notice to Proceed. This shall include all work, except warranty items, in accordance with the Contract Documents. C. The Contractor shall commence Work under this Contract on or before 30 calendar days from the receipt of the Notice to Proceed. D. The Contractor shall pay liquidated damages of $965.00 for each consecutive calendar day completion of the Work is delayed in accordance with Section 00800 - General Provisions. E. Work Included: 1. The Old RAS Pump and Motor Replacement project shall consist of the following activities: a. Furnishing and installing two vertical pedestal mount non-clog centrifugal pumps with associated appurtenances. b. Furnishing and installing new bolts and rubber gaskets. c. Demolition and removal of existing steel motor bases, concrete pump bases, and appurtenances. d. Construction of new concrete bases for pumps. e. Startup of system. 2. Contractor shall provide a plug for closing water flow from the wet well. 3. The existing pumps, motors, and concrete shall be disposed of properly by the Contractor at no additional expense the Owner

Bid Results

Water / Sewer

$188,518.00

Public - City

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
45
Bidding Soon
892
All Active Projects
349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

May 30, 2022

img_map_placeholder

To Be Determined, Sarasota, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.