BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2022 at 7:00 PM

Updated January 26, 2024

Site work and new construction of a civil project in Sheboygan, Wisconsin. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Project Category Code: Water/Wastewater Infrastructure, Underwater Construction/Repair/Maintenance, Water and Wastewater Facilities, Watershed Protection/Riprap This project includes an approximately 4,250 GSF Pump Station with primary occupancy classification F-2 (Low Hazard Factory Industrial), and separated H-3 hazardous occupancy at the Chemical Room. Construction type will be non-combustible Type IIB with a steel structure over concrete shore well and foundation, exterior masonry cavity walls, and a sloped metal roof. There is also a new intake and intake inlet structure in Lake Michigan, yard piping and site improvements, and other Work indicated in the Contract Documents. The total estimated cost of this project is $46,000,000 1. Last day for questions is January 10th. Please submit any final questions to me. 2. Last day for addendum to be issued is January 15th. Please be on the lookout for addenda next week. 3. Bidder's Proof of Responsibility form (Appendix F) is required to be filed with the Sheboygan Water Utility two days prior to opening of bids (January 18th). This applies to Prime Bidders/Contractors only. Thank you,

Post-Bid

Water / Sewer

$46,000,000.00

Public - City

New Construction, Site Work

156

42

33

6

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
67
Bidding Soon
959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

March 30, 2022

Project location map

72 Park Ave, Sheboygan, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.