BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 28, 2022 at 7:00 PM

Updated January 26, 2024

Site work and renovation of a mixed-use development in Federal Way, Washington. Working plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Plans call for the renovation of the existing athletic field. As of November 28, 2022, the site is being prepared for construction and is expected to begin in the first quarter of 2023. Completion is expected in the fourth quarter of 2023. A design-build team has been selected.

Pre-Construction/Negotiated

Playgrounds / Parks / Athletic Fields

$24,500,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
94
Bidding Soon
1,498
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2023

Project location map

1300 S 308th St, Federal Way, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.