EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2022 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving, outdoor lighting, new construction and addition to a mixed-use development in Auburn, Alabama. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for site work for a educational facility; for outdoor lighting for a educational facility; for paving for a educational facility; fitness / recreation center; fitness / recreation center; for the construction of a 20,600-square-foot fitness / recreation center; fitness / recreation center; fitness / recreation center; fitness / recreation center; playground / park / athletic field; playground / park / athletic field; 20,600-square-foot playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; 20,600-square-foot sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

122-B Tichenor Avenue, for furnishing all labor, materials and equipment necessary for the completion of the following project: AUBURN SOCCER COMPLEX The proposed additions to the Auburn Soccer Complex Facility will include a new multi-purpose building (20,600 SF) which will consist of a multi-purpose room, storage, restrooms, and a gymnasium with basketball and futsal courts; new free-standing restroom pavilion building; 3 new multi-purpose fields with lighting, sidewalks, and synthetic turf and natural grass options; a new parking lot facility and renovation of existing parking lots; and a new roundabout at main entrance on Wire Road. bidders are required to be compliant with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, Act No. 2011-535 (Code of Alabama (1975) 31-13-9) as amended May 16, 2012 regarding employment practices. The successful bidder is responsible for acquiring the appropriate business licenses and permits to conduct work within the City of Auburn. Your attention in particular is invited to the section entitled "Instructions to Bidders", which is to be followed in all respects. The City reserves the right to select the lowest responsible bidder as the best interest of the City may require, to award the purchase contract from any of the bids, to reject any and all bids, and to waive any informalities in bids received. Bids will be good for thirty (30) days after being opened by the City of Auburn, Alabama. Furnish all labor, materials, accessories, equipment, and services necessary for the complete and proper installation of all Work indicated on the drawings and specified in the Project Manual. Information pertaining to the Work and stipulated in this hereby section includes the following: 1. Project information. 2. Work covered by Contract Documents. 3. Work under separate contracts. 4. Access to site. 5. Coordination with occupants. 6. Work restrictions. 7. Specification and drawing conventions. *Addendum 1, 2, 3 and 4 have been issued.

Award

Educational

$7,975,949.00

Public - City

Addition, Demolition, New Construction, Outdoor Lighting, Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Metal Wall Panels, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Furniture, Seating, Chairs, Multiple Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains, Sump Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Nonmetal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Watering, Bases, Ballasts, and Paving, Rigid Paving, Aggregate Surfacing, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
39
Bidding Soon
560
All Active Projects
296
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

March 7, 2022

img_map_placeholder

2340 Wire Rd, Auburn, AL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Additions to the Auburn Soccer Complex Facility

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.