Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Shelbyville, Tennessee. Contact the soliciting agency for additional information.
Bedford, Cheatham, Davidson, Dickson, Giles, Hickman, Houston, Humphreys, Lawrence, Lewis, Lincoln, Macon, Marshall, Maury, Montgomery, Moore, Perry, Robertson, Rutherford, Smith, Stewart, Sumner, Trousdale, Wayne, Williamson, and Wilson Counties Project No. R3BVAR-M3-008 (PIN 116323.10) The on-call concrete pavement repair at various locations on various Interstate and State Routes. Project Length - 0.000 miles Completion Time - On or before 3/31/2023 (See Special Provision 108B) Each bid must be accompanied by an electronic bid bond or a Cashier's or Certified Check made payable to the Department of Transportation, or Irrevocable Letter of Credit naming the Department as beneficiary (for Mowing and Litter projects only), in an amount equaling not less than five percent (5%) of the amount bid. A Prime Contractor must prequalify with The Department of Transportation in accordance with Tennessee Code Annotated 54-5-117 and Tennessee Department of Transportation Rule 1680-5-3, Prequalification of ontractors, before bid authorization for highway contracts will be furnished. Prime contractors, except mowing and litter removal contractors, are required to be licensed with the State of Tennessee, Department of Commerce and Insurance (TDCI), Board for Licensing Contractors (BLC). Prime contractors must be licensed in the general classification (e.g. Heavy Construction (HC), Highway, Railroad, Airport Construction (HRA), Specialty (S), Municipal and Utility Construction (MU), or Electrical Contracting (CE)) for the type of work in the project which they will perform. Bidders may submit a Proposal without having a license and will be considered for award for twenty-one (21) days after Proposals are opened. If the Bidder does not have a license with the TDCI, on or before twentyone (21) days after Proposals are opened, the Bidder will be considered non-responsive and their Proposal will be rejected. All questions related to the Proposal Contract, Plans, Specifications or Special Provisions shall be directed to the Headquarters Construction Office (615-741-2414). Information received from other offices of the Tennessee Department of Transportation is strictly advisory The Department encourages the use of disadvantaged business enterprises on all contracts. TNDOT - 008 - On-Call Concrete Pavement Repair at Various Locations on Various Interstate and State Routes
Award
Roads / Highways
$1,621,264.00
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2021
January 10, 2022
Multiple Locations, Shelbyville, TN
Related To This Project
Shelbyville, TN
Bid Date: Jan 28 2022
Shelbyville, TN
Bid Date: Dec 17 2021
Shelbyville, TN
Bid Date: Jan 04 2022
Shelbyville, TN
Bid Date: Mar 02 2022
Shelbyville, TN
Bid Date: Feb 11 2022
Shelbyville, TN
Bid Date: Feb 11 2022
Shelbyville, TN
Bid Date: Feb 08 2022
Shelbyville, TN
Bid Date: Apr 01 2022
Shelbyville, TN
Bid Date: Sep 21 2023
Shelbyville, TN
Bid Date: Oct 17 2023
Shelbyville, TN
Bid Date: Sep 25 2023
Shelbyville, TN
Bid Date: Aug 28 2023
Shelbyville, TN
Bid Date: Aug 28 2023
Shelbyville, TN
Bid Date: Sep 14 2023
Shelbyville, TN
Bid Date: Aug 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.