BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2022 at 7:00 PM

Updated November 15, 2023

Site work, paving and new construction of a mixed-use development in New Town, North Dakota. Working plans call for the construction of a 6,750-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of January 24, 2022, project will rebid" Site is located approximant 13 miles east of New Town, ND and 3/4 of mile south of the intersection of BIA 27 and. ND HWY 23 The scope of the work includes furnishing all labor, equipment and materials for the construction of the following: 6,750 square feet solid waste transfer station, 264 square feet addition, site grading, concrete driving/ parking areas, water facilities for the new building, drainage improvements including storm pipes, inert pit, and all other incidentals required to complete the Work as specified. The contract price will not be increased without prior authorization from the Owner via the change order process. Funding for the work is provided by the IHS, and payments on the work will be processed by the Owner and the Federal Agency providing the funding. The Contractor shall be required to (a) commence work under this contract within fifteen (15) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than Three Hundred Sixty-Five (365) calendar days The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings: 1. tools 2. equipment 3. materials 4. labor 5. supplies 6. manufactured articles 7. all transportation to complete the work 8. temporary facilities B. Location of Work: Three Affiliated Tribes, McKenzie County North Dakota

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$180,000.00

Public - Federal

New Construction, Paving, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
9
Bidding Soon
79
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

July 18, 2022

Project location map

404 Frontage Rd, New Town, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.