Demolition, site work, paving, renovation and addition to a mixed-use development in Janesville, Wisconsin. Completed plans call for the addition of a sidewalk / parking lot; for the demolition of a sidewalk / parking lot; for the renovation of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; and pre-engineered storage facility.

As of December 3, 2021. This project is currently in its bidding phase. A construction timeline is yet to be confirmed. The City of Janesville, Wisconsin hereby gives notice that it will receive electronic bids for the following listed Public Work: Renovation and addition to existing Transfer Center. C2021-16 Transit Transfer Center Rehabilitation - For furnishing all the labor, materials, equipment, and doing all the work necessary for the professional construction and completion of the City of Janesville, Transit Transfer Center Rehabilitation located at 123 South River Street, Janesville, WI 53545. The Base Bid shall be lump sum and will involve a small addition for two new toilet rooms and new mechanical/ janitorial space as well as renovations of the existing facility. Work will include items such as: Miscellaneous demolition; excavation, cast-in-place concrete, reinforced concrete, precast concrete planks, masonry, aluminum doors/ windows, finish carpentry, general construction, painting, tile work, walk-off carpet tile, metals work; roof replacement (EPDM & Shingle), doors and frames, cabinetry/ countertops, curb and gutter, sidewalks, pavement, plumbing, mechanical, electrical/ technology and other trades. Additionally, there are a few Alternate Bid items which are being sought. This project will be funded using federal Coronavirus Aid, Relief, and Economic Security (CARES) Act funds. Federal Davis-Bacon Act Wage Decisions apply to this project. In addition to the DWD certified monthly payroll requests, the FTA requires the contractor to submit weekly payrolls. The City of Janesville requires the contractor to submit those weekly payrolls to the City for transmission to the FTA. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under section 5.5(a)(3)(i) of Regulations, 29 CFR part 5. Optional Form WH-347 is available for this purpose and may be purchased from the Superintendent of Documents (Federal Stock Number 029-005-00014-1), U.S. Government Printing Office, Washington, DC 20402. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. No bidder on this contract may withdraw their bid within 90 days after the actual date of the bid opening. No paper bids will be accepted. All bidders shall bid in accordance with contract document's Section 2 'Information to Bidders'. The above Public Work will be let to the lowest responsible bidder and must be performed in accordance with the plans, specifications, and contracts on file with the City Clerk. The determination of the lowest responsible and best bid will be decided by the City Engineer, subject to review by the City Council. The Council reserves the right to reject any and all bids. No bid will be considered unless accompanied by a certified check equal to 10 percent of the bid or a bid bond in equal amount, payable to the City as guaranty that if the bid is accepted, the bidder will execute and file the proper contract and performance bond within ten days from the date the lowest responsible bidder's bid is accepted. In case the bidder fails to execute such contract and performance bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. If applicable, Federal Davis Bacon wage rates are included in the Contract Documents, as well as on file in the City Clerk's Office. No bidder may withdraw their bid within 45 days after the actual date of the bid opening, unless stated otherwise above.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,262,000.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
117
Bidding Soon
2,011
All Active Projects
834
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2021

April 4, 2022

img_map_placeholder

123 S River St, Janesville, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.