BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Summerville, South Carolina. Completed plans call for site work for a water / sewer project.

As of April 26, 2023, project has been under construction since last month, and is expected to be completed in 3 years. The owner has determined a prequalified list of construction managers. Dorchester County owns and operates the Lower Dorchester Wastewater Treatment Plant (WWTP). The County has a National Pollutant Discharge Elimination System (NPDES) permit for an annual average design flow of 8 million gallon per day (mgd) with permit limits for expansion to 10 and 12 mgd. The WWTP is located 0.78 mile from the confluence with the Ashley River near the Charleston County line. The Lower Dorchester WWTP serves approximately 44,000 people. The majority of the influent flow is pumped to the WWTP. Dorchester County wishes to expand the Lower Dorchester WWTP to accommodate growth in the service area. The projected wastewater flow in the Lower Dorchester service area is anticipated to exceed the Lower Dorchester WWTP permitted capacity of 8 mgd over the next 20-year planning period. The County has currently committed 9 mgd of capacity at the Lower Dorchester WWTP. Additionally, the County has received firm requests for an additional 4.5 mgd of capacity, which is commensurate with the anticipated growth per the County's Comprehensive Plan. It is anticipated that the majority of the growth in the Lower Dorchester service area will occur within the next 5 to 10 years. Therefore, an expansion of the Lower Dorchester WWTP from 8 to 16 mgd is necessary to prepare for the anticipated near-term growth. The County is also anticipating growth in an area north of the Lower Dorchester service area, characterized as the Central Dorchester service area, within the next 5 to 15 years. An initial capacity of 4 mgd has been identified for a proposed Central WWTP with a future expansion to 8 mgd. The Preliminary Engineering Report (PER) for the proposed Central WWTP is being prepared as a separate document from this Basis of Design Report (BODR) for the Lower Dorchester WWTP expansion project. The proposed Central WWTP is discussed in this BODR due to the re-distribution of the County's ultimate oxygen demand (UOD) wasteload allocation between the two treatment facilities.

Under Construction

Water / Sewer

$10,000,000.00

Public - County

Site Work

430

39

4

8

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
65
Bidding Soon
730
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.