BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Austin, Texas. Working plans call for the renovation of a educational facility.

As of 4/25/2022, all bids have been rejected. Owner hopes to rebid this project in the future. The Board of Trustees, Austin Independent School District will accept a sealed bid/proposal for the following item(s).Upgrades and Improvements at Blackshear Elementary School Questions Due Date: Dec 7th 2021, 3:00 PM CST 1.1. AISD Project Number: 21-0008-BLKSH 1.2. AISD Solicitation Number: 22CSP043 Brief Description of Scope of Work (the "Work"): o Replacing the Main Switchgear and electrical systems to accommodate the HVAC work. o Waterproofing behind the new switchgear. o Replacement of the existing chiller on the roof of the boiler room building. Existing chiller to be demolished. New chiller to be located on the ground on a concrete pad. New chilled water piping to be run underground from the new chiller to the crawlspace and connect to existing chilled water piping in building basement and crawlspace. Area for new Chiller to be protected by a chain link fence. o Replacement of existing chilled water pump and chilled water expansion tank. o Provide new air-dirt separator and filter feeder at chilled water hydronic system. o Replacement of AHU-2. o Replacement of building DDC Building Management System. New system to include new like for like controls componentsfor all existing mechanical equipment in addition to new components for new equipment. o Raising the height of Penthouse 2 to accommodate the new larger AHU 2. o Installing a new metal wall panels and metal roof on Penthouse 2. o Regrading and minor site work on the East side of the campus to divert water away from the building entrance. o Other Work indicated in the Contract Documents. AISD shall have the right under the Contract to assess liquidated damages for each and every calendar day beyond the Substantial Completion Date set out in the Contract that the Work fails to be substantially complete in the following amount per day: $500

Final Planning

Educational

$1,377,000.00

Public - City

Renovation

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
146
Bidding Soon
3,680
All Active Projects
1,411
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 20, 2021

October 25, 2022

img_map_placeholder

Multiple Locations, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.