BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Des Moines, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The improvement includes base widening with 4-inch thick Hot Mix Asphalt (HMA) paving, 3-inch thick HMA overlay paving, 7-inch thick Portland Cement Concrete (PCC) paving, pavement scarification, PCC patching, pavement markings, erosion control, site restoration, and other associated work and incidental items; in accordance with the contract documents, including Plan File No. 637-152/175, along George Flagg Parkway from 350 feet west of Fleur Drive to S.W. 30th Street, Des Moines, Iowa. Accessibility for individuals with disabilities. The City of Des Moines is pleased to provide accommodations to individuals with disabilities or groups and encourages participation in City government. To better serve you, please notify us at least three business days in advance when possible at 515-283-4209, should special accommodations be required. For consideration by the City Council (Council) at its meeting on January 24, 2022. The City of Des Moines (Jurisdiction) reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced upon approval of the contract by the Council, and completed as stated below. Bid Security. Each bidder shall accompany its bid with bid security as defined in Section 26.8 of the Iowa Code and as specified by the Jurisdiction. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in the bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. George Flagg Parkway Resurfacing from Fleur Drive to SW 30th Street, 062020017 T This project shall be fully completed not later than September 16, 2022, and in accordance with the Completion Provisions. This project shall be fully completed not later than September 16, 2022, Engineer's Construction Estimate. $550,000.00 The City's Overall Annual DBE/TSB Goal for calendar year 2021 is 6.03%

Award

Roads / Highways

$428,073.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
40
Bidding Soon
452
All Active Projects
240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

January 20, 2022

img_map_placeholder

George Flagg Pkwy, Des Moines, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.