BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Crescent, Iowa. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Project Id : 211221 S1 Counties : Pottawattamie Proposal Section(S): 0001 Roadway Items - Imx-029-4(112)72--02-78 0002 Alternate Aa Option 1: Pcc Shoulder, Bid This Section if Alternate 'aa' Option 1 Is Chosen 0003 Alternate Aa Option 2: Hma Shoulder, Bid This Section if Alternate 'aa' Option 2 Is Chosen 0004 Design No. 0122; 252'-0 X 36'-0 Pretensioned Prestessed Concrete Beam Bridge - Brfimx-029- 4(113)72--14-78 0005 Roadway Items 0006 Traffic Signs Items - Imx-029-4(115)72--02-78 0007 Roadway Lighting Items - Imx-029-4(116)72--02-78 0008 Payment Adjustment Incentive Items Working Days : 140 Projects Included: BRFIMX-029-4(113)72--14-78 Route: I-29 Co Rd G12 Interchange 0.4 Mi N of I-880 Estimated Value : $4,000,000 - $5,000,000 Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to Execute a Contract and File an Acceptable Performance Bond and Certificate of Insurance Within 30 Days of the Approval Date for Awarding the Contract Will Be Just and Sufficient Cause for the Denial of the Award and Forfeiture of the Proposal Guaranty. On Federal-aid Projects, Where Disadvantaged Business Enterprise (Dbe) Goals Have Been Established, the Bidder Is Required to Complete and Submit Form 102115 With the Bid Documents. On All Projects Without Dbe Goals, the Contractor Must Show That Affirmative Action Has Been Made to Seek Out and Consider Dbes as Potential Subcontractors. Minimum Wage Rates for All Federal-aid Projects Have Been Predetermined by the U.s. Secretary of Labor and Are Set Forth in the Specifications. However, This Does Not Apply to Projects Off the Federal-aid Highway System. All Federal-aid Projects Are Subject to the Contract Work Hours Standards Act, as Amended (Title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and Implementing Regulations. The Iowa Dot Reserves the Right to Waive Technicalities and Reject Any or All Bids. Iowa Dot - Bid Order Number: 029 - Bridge Replacement - PPCB - I-29 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$4,436,524.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

234

15

9

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
518
All Active Projects
211
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

April 4, 2022

img_map_placeholder

I-29, Crescent, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.