BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Hawthorn Woods, Illinois. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of February 7, 2022, the project has not been awarded yet. A timeline for award has not been established yet. Notice is hereby given that Lake Zurich Community Unit School District 95, Lake County, IL, will receive sealed bids from interested trade contractors for 02A-1 Demolition, 03A-1 Building Concrete, 04A-1 Masonry, 05A-1 Structural Steel, 06A-1 General Trades, 07A-1 Roofing, 08B-1 Aluminum, Glass, and Glazing, 09A-1 Drywall, 09D-1 Acoustic Ceiling, 09F-1 Flooring, 09G-1 Painting, 21A-1 Fire Protection, 22A-1 Plumbing, 23A-1 HVAC, and 26A-1 Electrical, for the 2022 STEAM Additions and Interior Renovations at Spencer Loomis Elementary School and Middle School North and Isaac Fox Elementary School and Middle School South for Lake Zurich Community Unit School District 95 - Bid Release 1. The proposed project consists of, but is not limited to, interior renovations to the learning media centers at Spencer Loomis Elementary School and Middle School North, a three classroom addition at Middle School North, a three classroom addition at Middle School South, and interior corridor flooring replacement at Isaac Fox Elementary School and Middle School South. A Bid Bond or Certified Check in the amount of 10% of the bid is to accompany the proposal. The successful bidder must furnish a Performance Bond and Labor and Material Payment Bond in an amount equal to 100% of the bid amount, with sureties approved by the owner, and Certificate of Insurance within ten (10) days of the award of the contract. The successful bidder is required to pay the Prevailing Wage for work under this Contract and shall submit certified payroll records in compliance with the Prevailing Wage Act (820 ILCS 130/1-12). This Project is Tax Exempt The Board of Education of Lake Zurich Community Unit School District 95 reserves the right to reject any or all bids or any part thereof and to waive any technicality irregularity. Bid Result : 02A-1 Demolition - Terra Demolition, Inc. - $ 197,948.00 03A-1 Building Concrete - Tor Construction Company - $ 329,900.00 04A-1 Masonry - Ebben Masonry, Inc. - $ 346,500.00 05A-1 Structural Steel - Jack Frost Ironworks - $ 426,980.00 06A-1 General Trades - Doherty Construction, Inc. - $ 1,022,000.00 07A-1 Roofing - Malcor Roofing - $ 438,430.00 08B-1 Aluminum, Glass, and Glazing - Reliant Contract Glazing - $ 312,390.00 09A-1 Drywall - Doherty Construction, Inc. - $ 477,900.00 09D-1 Acoustical Ceiling - Integrated Specialty Contractors - $ 251,340.00 09F-1 Flooring - Pinnacle Flooring Company - $ 707,000.00 09G-1 Painting - Cosgrove Construction, Inc. - $ 108,900.00 21A-1 Fire Protection - S.J. Carlson Fire Protection Inc. - $ 68,942.00 22A-1 Plumbing - Ernie Peterson Plumbing, Inc. - $ 230,650.00 23A-1 HVAC - McDonough Mechanical Services - $ 500,000.00 26A-1 - Electrical - Argon Electric Company, Inc - $ 674,000.00

Bid Results

Educational

$6,092,880.00

Public - County

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
130
Bidding Soon
2,138
All Active Projects
930
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

January 17, 2022

img_map_placeholder

Multiple Locations, Hawthorn Woods, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.