BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Port Allen, Louisiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project will consist of the removal and replacement of specified failed asphalt concrete areas within the Port of Greater Baton Rouge. ESTIMATED CONSTRUCTION COST: $75,000-$85,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The contract will be awarded to the lowest responsible bidder without discrimination on grounds of race, color, sex or national origin. Disadvantaged businesses will be afforded full opportunity to submit bids. In addition, The Greater Baton Rouge Port Commission supports the goal of creating opportunities for meaningful participation in Port construction contracts for such businesses that have been certified through the Louisiana Unified Certification Program to be owned and controlled by social and economically disadvantaged persons (DBEs). In furtherance of that goal, bidders are encouraged to seek proposals from DBEs as subcontractors in the preparation of their bids. Bid security in the amount of five percent (5%) of the Total Bid must accompany each Bid and shall be made payable to the Owner in the form of a bid bond, a certified check, or cashiers check as prescribed by La R.S. 38: 2218(A). Pursuant to La. R.S. 38:2214 (C) Bids containing patently obvious, unintentional, and substantial mechanical, clerical, or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the contractor if clear and convincing sworn, written evidence of such errors is furnished to the public entity within forty-eight hours of the bid opening excluding Saturdays, Sundays, and legal holidays. Such errors must be clearly shown by objective evidence drawn from inspection of the original work papers, documents, or materials used in the preparation of the bid sought to be withdrawn. If the public entity determines that the error is a patently obvious mechanical, clerical, or mathematical error, or unintentional omission of a substantial quantity of work, labor, material, or services, as opposed to a judgment error, and that the bid was submitted in good faith it shall accept the withdrawal and return the bid security to the contractor.

Bid Results

Roads / Highways

$209,243.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
50
Bidding Soon
586
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

January 17, 2022

img_map_placeholder

Multiple Locations, Port Allen, LA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.