BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Waxahachie, Texas. Completed plans call for site work for a road / highway.

Scope of Work of the Contract includes furnishing, installing, and providing all labor and materials required for construction of the earthwork and miscellaneous items as more fully described in the Drawings and Specifications. Remove and Dispose of Existing Fence (All Materials) Relocation of Existing Fence Clearing and Grubbing including Tree Removal and Disposal (within ROW and Easements) 7' Moisture Conditioning (Zone I) 10' Moisture Conditioning (Zone II) Poly Sheeting On Pads Construction Entrance Silt Fence Temporary Stream Crossing Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor Bidder must submit its Bid and bid securities in compliance with District's Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and bid securities must be submitted through online. Bidder must register on this website in order to submit a Bid and bid security and there is no charge to submit Bids and bid securities on this website. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to through the use of an Electronic Signature, as defined by and in accordance with Owner's Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Owner's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. 1. Rough Site Grading - 90 Calendar Days from commencement. 2. Final Site Grading - 21 Calendar Days from commencement

Bid Results

Roads / Highways

$1,540,480.00

Public - County

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
64
Bidding Soon
3,594
All Active Projects
1,414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

January 31, 2022

img_map_placeholder

Farm to Market Rd 878, Waxahachie, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.