BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Eaton, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project consists of the roundabout improvements with the installation of approximately 3,552 TON of HMA, 2,911 CY of ABC, 4,389 SY of 8.5" Concrete Pavement-Truck Apron, 1,630 SY of Concrete Pavement-Median (6"), 820 LF of 15" RCP, 152 LF of 18" RCP, 82 LF of 24" RCP, 111 LF of 36" RCP, 87 LF of RCES (23"x14"), 1,055 SY Concrete Pavement - Sidewalk, 4,422 LF of CDOT Vertical II-B (2' Gutter), 3,527 LF. of CDOT Mountable Type-I-M (1' Gutter), 263 LF CDOT Mountable Type II-M (2' Gutter), 18,284 SY Base/Subbase Prep other miscellaneous work. Work also includes removal and disposal off-site of approximately 28100 SF of Gravel Surface, 11,242 SY of Asphalt Pavement, 260 LF of Curb and Gutter, 264 LF. Storm Culvert and other miscellaneous work. Work to be coordinated with Weld County and Eaton High School includes Traffic Control and SWMP. Submit questions to Brad Curtis, P.E. with Northern Engineering at bcurtis@northernengineering.com. All bid proposals must be on the form provided and must be accompanied by a certified check or bank draft, payable to the order of the Town of Eaton negotiable U.S. Government bonds (at par value) or a satisfactorily Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid. Checks accompanying bids not accepted will be returned to the bidders. The selected Contractor will be required to furnish a 100% Contract Performance Bond and a 100% Contract Payment Bond to cover the execution of the Work which shall be in conformity with the Form of Bonds contained in the Specifications and for the Contract Amount. The Work will be substantially completed July 18, 2022, and complete and ready for final payment July 30, 2022. No bids shall be withdrawn after the opening of the bids without the consent of the Town of Eaton, for a period of sixty (60) days after the scheduled time of opening bids. The Town of Eaton reserves the right to reject any or all bids, waive any informalities in bids, and accept the bid that, in the opinion of the Town of Eaton, is to the best interests of the Town of Eaton.

Award

Roads / Highways

$2,432,523.00

Public - City

Paving, Site Work

3

11

252

15

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
105
Bidding Soon
1,531
All Active Projects
651
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 11, 2022

March 14, 2022

July 31, 2022

img_map_placeholder

Co Rd 74 & Co Rd 35, Eaton, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.