BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Citronelle, Alabama. Design plans call for site work for a playground / park / athletic field.

As of March 4, 2022, an architect has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Project Description The project includes the construction of a flow-through system splash pad facility to include handicapped accessible equipment and renovations as needed for handicapped accessibility at a restroom facility to serve the splash pad area. The project will be constructed in the Citronelle Memorial Playground Park. Scope of Services Required The following services will be required of an engineering consultant: Preparation of final plans and specifications including all survey work necessary to prepare final plans and specifications; Coordinate, review and approval of plans and specifications, contracts, change orders, permits/concurrences, bid tabulations/engineer recommendations, notice to proceed, change orders, and final inspection; Preparation of the bid package and bid advertisement; Supervision of the bid process; and Supervision and inspection of the construction process from the Pre-Construction Conference through Final Inspection. Anticipated Start and Completion Date Engineering services need to start immediately upon entering into the contract with the City of Citronelle. The City of Citronelle is interested in implementing the project in a timely manner that will allow the City of Citronelle to open the splash pad facility for the 2022 summer season. Type of Contract The contract between the Engineer and the City of Citronelle will be a flat fixed-fee contract to be negotiated between the firm selected and the City of Citronelle Final selection is expected to be made by the City Council of Citronelle at the regularly scheduled meeting of November 23, 2021. The project will be funded with American Rescue Plan Act Program for a total project cost of $125,000. The method of contractor selection has not been determined at this time.

Design

Playgrounds / Parks / Athletic Fields

$125,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
33
Bidding Soon
504
All Active Projects
233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2022

img_map_placeholder

Multiple Locations, Citronelle, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.