Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Savage, Maryland. Completed plans call for the renovation of a water / sewer project.
Howard County intends to procure the services of a construction firm to replace Motor Control Center 5 (MCC-5) and relocate equipment loads at Little Patuxent Water Reclamation Plant. The scope of work consists of furnishing of all materials and labor for the construction of, complete in place, demolishing the existing MCC-5, replacing with new MCC-5, transferring equipment loads and controls, miscellaneous appurtenances and incidental items of work. 1. The furnishing of all material and the construction required for the new / replacement MCC-05 with new electrical gear, conduits, feeders, motor controls, miscellaneous appurtenances and incidental items of work. 2. The furnishing of all material and the construction required for all indicated ATS units, transformers, and panel boards with new conduits, feeders, miscellaneous appurtenances and incidental items of work. 3. Provide housekeeping pad modifications for MCC-05 and provide supports for wall-mounted transformers as well as ATS units and panel boards 4. The furnishing of all material and the construction required for the transfer of existing equipment loads from existing MCC-06 to Panel boards PJ and PR, including conduits and feeders. Loads consist of RAS Pumps 16, 17, and 18 and incidental items of work. 5. The furnishing of all material and the construction required for the transfer of existing equipment loads from existing MCC-06 to MCC-05, including conduits and feeders. Loads consist of FC-3 collector arm, FC-3 scum pump and West Pipe Gallery splitter sump pump and incidental items of work. 6. The furnishing of all material and the construction required for the transfer of existing equipment loads from existing MCC-05 to MCC-22, including conduits and feeders. Loads consist of PC-3 collector arm and PC-4 collector arm and incidental items of work. 7. The furnishing of all material and construction required for the installation of new disconnect switches, local control panel, and associated conduit and wiring for existing scum pumps at Final Clarifiers FC-3, FC-4 and FC-5 and incidental items of work. 8. The furnishing of all material and construction required for the replacement of existing disconnect switches, and addition a new local control panel, and associated conduit and wiring at existing Primary Clarifiers PC-3, and PC-4 for the collector arm and incidental items of work. 9. Provide miscellaneous instrumentation upgrades and testing at field laboratory building. Testing shall include I/O checkout, loop, and SCADA testing. 10. The furnishing of all material and the construction required for the installation of new ventilation system, including fans, ducts, dampers, supports, and miscellaneous appurtenances and incidental items of work. All proposed work shall be completed within 120 calendar days from notice to proceed MBE Participation (%) 15.0 Each bid submission shall be accompanied by an electronic copy of bid bond OR certified check. The bid deposit shall be 5% of the total bid, made payable to "Director of Finance, Howard County". A performance bond and payment bond for the full amount of the contract price shall be required of the successful bidder within 10 days after award notification. Said bond shall be issued by a surety company subject to approval of Howard County. Q&A Deadline 03/08/2022 4:00 PM (EST) Liquidated Damages $500.00 Per Calendar Day
Award
Water / Sewer
$1,915,336.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2022
May 30, 2022
To Be Determined, Savage, MD
Related To This Project
Savage, MD
Bid Date: Feb 22 2023
Savage, MD
Bid Date: Dec 16 2020
Savage, MD
Bid Date: Jul 20 2023
Savage, MD
Bid Date: Feb 14 2018
Savage, MD
Bid Date: Apr 04 2024
Savage, MD
Bid Date: Feb 01 2023
Cumberland, MD
Bid Date: May 17 2022
Bel Air, MD
Bid Date: May 17 2022
Salisbury, MD
Bid Date: May 17 2022
Elkridge, MD
Bid Date: Apr 13 2022
Sabillasville, MD
Bid Date: Mar 30 2022
California, MD
Bid Date: May 17 2022
District Heights, MD
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.