BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Austin, Texas. Contact the soliciting agency for additional information.

CONTRACT TERM: This service shall begin within ten (10) days after award and anticipated to be completed within six (6) months of Notice of Award. Services shall be completed by 8/31/2021. Contractor to provide all labor, equipment, tools, materials, parts, supplies, supervision, and any other items and services necessary to replace current equipment with a new 300kW Generator and NEMA 3 ATS with 500-gallon skid tank. b) Decommissioning and removal of existing generator and equipment shall be done by Contractor. Bidder should provide salvage cost as a line item in the Attachment B Compensation and Fees that may be taken as a credit. If TFC decides not to take the credit, Contractor will be responsible for removal and transportation to a to be determined salvage yard or other TFC location. c) Installation shall be provided by a licensed electrician and installed on the existing location. All electrical work performed must be in compliance with NFPA 70, NEC and shall be performed by a licensed Journeyman Electrician. d) The generator site is enclosed. Removal of the old equipment and installation of the new will require use of a crane. Contractor is responsible for all necessary equipment to remove, install, and transport. e) Work shall be conducted in manner not to interrupt normal business operations of the building. f) Contractor shall be responsible for Startup and Testing to bring the new 300KW Generator and ATS system online. g) Installation shall include a docking station to allow a portable generator to be connected to the Emergency Distribution System and Generator in case of permanent generator failure and load bank testing. Docking station shall provide an instant method of transferring power from a portable, externally provided generator to the building Emergency Distribution System. h) Contractor shall provide complete Operation & Maintenance Manuals in digital format that includes: i) Construction Drawings ii) Materials /Components list including parts numbers iii) Maintenance and service requirements and methods. i) Installation and equipment shall meet all applicable NEC/NFPA standards. j) Contractor shall provide training to TFC of the newly installed system on how to perform routine testing and maintenance on the system to ensure compliance with NFPA, NEC standards. k) Upon completion of the work, area will be cleaned, and all debris accumulated will be removed from job site so as not to disrupt employees or normal operations of affected area. l) Project Completion Time: Contractor must perform work within timeframe agreed to by TFC and Contractor prior to starting. If Contractor cannot perform work within timeframe stated, Contractor may be subject to liquidated damages up to $1,000.00 per day. Deadline for Submission of Questions and Alternates - December 8, 2021, 12:00 Noon TFC's Response to Questions and Determination of Proposed Alternates - December 15, 2021

Post-Bid

Medical

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
148
Bidding Soon
3,619
All Active Projects
1,352
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 5, 2022

February 4, 2022

img_map_placeholder

1100 W 49th St, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.