BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rocky Ford, Colorado. Completed plans call for site work for a water / sewer project.

***As of January 4, 2021, the project has been awarded for the amount of $68,750.98.*** Contractor Questions: All questions related to the project shall be submitted via e-mail to the Project Manager, Eric Stahnke- eric.stahnke@state.co.us. The deadline for questions is December 9, 2021 by 10 AM. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self Service (VSS) website. Bidders may not automatically be notified of the existence of a modification or addendum. It is the responsibility of the bidder to check the VSS website periodically to see if any modifications have been issued. Failure to retrieve such modifications and include their provisions in your bid response may result in your bid being deemed non-responsive. WRITTEN QUESTIONS DUE December 9, 2021 by 10 AM BID BOND: (NOT EXPECTED FOR THIS PROJECT AS IT IS UNDER THE THRESHOLD) A bid bond is required for all competitive sealed bids when the price exceeds $150,000. A bid guarantee in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a firm commitment, such as a bid bond, bank money order, certified check or cashier's check. Checks or money orders should be made payable to the Treasurer, State of Colorado. An irrevocable letter of credit is not acceptable as a bid guarantee. Failure to furnish a bid guarantee in the proper form and amount by the time set for opening of bids may be cause for rejection of the bid. PERFORMANCE BOND, LABOR AND MATERIAL BOND: (NOT EXPECTED FOR THIS PROJECT AS IT IS UNDER THE THRESHOLD). The successful bidder shall furnish a bond in the amount of 100% of the contract price for performance and for material and labor payment when bid is equal to or exceeds $150,000. The bond shall be executed on the standard State of Colorado form. The State requests that the Surety and Contractor leave the date of the Contract found on the first page of each bond form, blank and we will 'pen' in the date after the Controller executes the Contract. These bonds will be submitted along with the standard State Agreement form within 10 days of the "Notice of Award." The lowest responsible bid, taking into account the Colorado resident bidder preference provision of Colorado Law which is set forth in Article 48 of the General Conditions, will be determined by and the purchase order or contract will be issued, to the extent that the total dollar amount is within available funds to finance the construction. If all bids exceed such amount, the right is reserved to reject all bids. The Division of Parks and Wildlife reserves the right to reject any or all proposals, to waive informalities, and to accept any proposal deemed desirable. The Division of Parks and Wildlife shall not be obligated or liable for any cost incurred by any company or individual reviewing this proposed project or prior to the issuance of a contract approved by the Controller of the State of Colorado or such assistant as he may designate. Any and all costs, to review the project, inspect the proposed construction site, prepare and or submit bids will be the sole responsibility of the bidder. No Pre-bid Meeting Minority Business Statement: The undersigned bidder shall certify by checking below that the corporation, partnership, or sole proprietorship IS or IS NOT 50 percent (50%) or more owned and operated by a socially or economically disadvantaged group per the Small Business Administration. The Project Coordinates below locate the center of the project. Wildlife Area Address: Rocky Ford SWA 23126 CR FF Rocky Ford Otero Project Coordinates: Latitude: 38.054337 Longitude: -103.651747 View Google Map: Project Location

Award

Water / Sewer

$68,751.00

Public - State/Provincial

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
9
Bidding Soon
180
All Active Projects
74
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

January 17, 2022

img_map_placeholder

23126 Co Rd P, Rocky Ford, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.