EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 6, 2021 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Minooka, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City/County Kendall Const. Var. Width Pavt. & Traf. Signals Incl. 4,358 Cu Yd. Earth Exc.; 7,996 Sq. Yd. Sub-bse. Gran. Mat'l. Ty B 12"; 1,294 Ton Polymerized Hot Mis Asph. Binder Cse. Il-9.5f.g; N70 ; 653 Ton Polymerized Hot Mix Asph. Binder Cse. Il-19.0 N70; 1,552 Ton Polymerized Hot Mix Asph. Surf. Cse. Il-9.5 Mix "D", N70; 23,560 Ft. Thermoplastic Pavt. Mking - Line 4"; 1,513 Ft. Underground Conduit, Pvc 2" Dia.; 4 Each St. Comb. Mast Arm Assembly & Pole 54ft; 8 Each Signal Head Polycarbonate, Led 1- Face; 5-sect. Bracket Mounted; 8 Each Signal Head Polycarbonate; Led, 1-face, 5-sect. Mast Arm Mounted; 1 Each Radar Vehicle Detectection Sys.; 1 Each Full- Actuated Controller & Ty Iv Cabinet, Special; Etc. (1.03 Miles). Project Location: Ridge Road & Route 52 Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Const. Var. Width Pavt. And Traf. Signals - 19-00152-00-TL

Bid Results

Roads / Highways

$1,532,711.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
156
Bidding Soon
2,313
All Active Projects
973
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2021

February 1, 2022

img_map_placeholder

US-52 & Ridge Rd, Minooka, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Const. Var. Width Pavt. And Traf. Signals

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.