Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a civil project in Vero Beach, Florida. Completed plans call for the renovation of a water / sewer project.
Demolition of existing Reuse Control Panel (RCP); construction of three (3) Variable Frequency Drives (VFDs) for the reuse pump station pumps; and replacement of three (3) existing reuse pump station pump motors with new 100-hp, TEFC, inverter duty rated motors; construction of instrumentation, and all other wiring, labor, materials to provide a fully functional system. All bidders shall submit one (1) original and one (1) copy of the Bid Proposal forms provided within the specifications. Please note that the questionnaire must be filled out completely including the financial statement. BID SECURITY must accompany each Bid, and must be in the form of an AIA Document A310 Bid Bond, properly executed by the Bidder and by a qualified surety, or a certified check or a cashiers check, drawn on any bank authorized to do business in the State of Florida. Bid Security must be in the sum of not less than Five Percent (5%) of the total amount of the bid, made payable to Indian River County Board of County Commissioners. In the event the Contract is awarded to the Bidder, Bidder will enter in a Contract with the County and furnish the required 100% Public Construction Bond and certificates of insurance within the timeframe set by the County. If Bidder fails to do so, the Bid Security shall be retained by the County as liquidated damages and not as penalty. The County reserves the right to delay awarding of the Contract for a period of ninety (90) days after the bid opening, to waive informalities in any bid, or reject any or all bids in whole or in part with or without cause/or to accept the bid that, in its judgement, will serve the best interest of Indian River County, Florida. The County will not reimburse any Bidder for bid preparation costs. The CONTRACTOR shall be substantially completed with the following timeframe (a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall complete the following tasks: 1. Obtain all necessary permits. 2. Submit shop drawings for all materials and equipment to be utilized on the job. 3. Perform all photographic recording and documentation of conditions prior to construction. 4. Locate all existing utilities in the area of work. 5. Secure approval of shop drawings. 6. Mobilize all labor, equipment, and materials and prepare the site. 7. Notify all utilities and other affected parties prior to initiating construction. (b) From 31 calendar days to 270 calendar days from the effective date of Notice to Proceed, the CONTRACTOR shall complete the following tasks: 1. Install all mechanical and electrical equipment, pipe and appurtenant items. 2. Perform all equipment start-ups and field testing. 3. Restore all disturbed areas to their pre-construction condition. 4. Correct all deficiencies noted by Engineer. Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial Completion. (c) From 271 calendar days to 300 calendar days from the effective date of Notice to Proceed, the CONTRACTOR shall complete the following tasks: 1. Clean up project area. 2. Remove all equipment and material from project site. 3. Perform contract closeout procedures. 4. Demobilize.
Award
Water / Sewer
$606,527.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2021
January 17, 2022
2500 6th Ave, Vero Beach, FL
Related To This Project
Vero Beach, FL
Bid Date: Jan 12 2022
Vero Beach, FL
Bid Date: Dec 01 2020
Vero Beach, FL
Bid Date: Dec 03 2020
Vero Beach, FL
Bid Date: Dec 01 2020
Vero Beach, FL
Bid Date: Oct 06 2020
Vero Beach, FL
Bid Date: Feb 08 2022
Vero Beach, FL
Bid Date: Sep 01 2020
Vero Beach, FL
--
Vero Beach, FL
--
Vero Beach, FL
Bid Date: Feb 15 2022
Vero Beach, FL
Bid Date: Feb 16 2022
Vero Beach, FL
Bid Date: Feb 22 2022
Vero Beach, FL
Bid Date: Feb 22 2022
Vero Beach, FL
Bid Date: Feb 22 2022
Vero Beach, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.