Renovation of a civil project in Vero Beach, Florida. Completed plans call for the renovation of a water / sewer project.

Demolition of existing Reuse Control Panel (RCP); construction of three (3) Variable Frequency Drives (VFDs) for the reuse pump station pumps; and replacement of three (3) existing reuse pump station pump motors with new 100-hp, TEFC, inverter duty rated motors; construction of instrumentation, and all other wiring, labor, materials to provide a fully functional system. All bidders shall submit one (1) original and one (1) copy of the Bid Proposal forms provided within the specifications. Please note that the questionnaire must be filled out completely including the financial statement. BID SECURITY must accompany each Bid, and must be in the form of an AIA Document A310 Bid Bond, properly executed by the Bidder and by a qualified surety, or a certified check or a cashiers check, drawn on any bank authorized to do business in the State of Florida. Bid Security must be in the sum of not less than Five Percent (5%) of the total amount of the bid, made payable to Indian River County Board of County Commissioners. In the event the Contract is awarded to the Bidder, Bidder will enter in a Contract with the County and furnish the required 100% Public Construction Bond and certificates of insurance within the timeframe set by the County. If Bidder fails to do so, the Bid Security shall be retained by the County as liquidated damages and not as penalty. The County reserves the right to delay awarding of the Contract for a period of ninety (90) days after the bid opening, to waive informalities in any bid, or reject any or all bids in whole or in part with or without cause/or to accept the bid that, in its judgement, will serve the best interest of Indian River County, Florida. The County will not reimburse any Bidder for bid preparation costs. The CONTRACTOR shall be substantially completed with the following timeframe (a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall complete the following tasks: 1. Obtain all necessary permits. 2. Submit shop drawings for all materials and equipment to be utilized on the job. 3. Perform all photographic recording and documentation of conditions prior to construction. 4. Locate all existing utilities in the area of work. 5. Secure approval of shop drawings. 6. Mobilize all labor, equipment, and materials and prepare the site. 7. Notify all utilities and other affected parties prior to initiating construction. (b) From 31 calendar days to 270 calendar days from the effective date of Notice to Proceed, the CONTRACTOR shall complete the following tasks: 1. Install all mechanical and electrical equipment, pipe and appurtenant items. 2. Perform all equipment start-ups and field testing. 3. Restore all disturbed areas to their pre-construction condition. 4. Correct all deficiencies noted by Engineer. Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial Completion. (c) From 271 calendar days to 300 calendar days from the effective date of Notice to Proceed, the CONTRACTOR shall complete the following tasks: 1. Clean up project area. 2. Remove all equipment and material from project site. 3. Perform contract closeout procedures. 4. Demobilize.

Award

Water / Sewer

$606,527.00

Public - County

Renovation

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
46
Bidding Soon
871
All Active Projects
405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 17, 2022

img_map_placeholder

2500 6th Ave, Vero Beach, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.