BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Gainesville, Virginia. Completed plans call for site work for a road / highway.

All inquiries for information regarding Bid Submission requirements or Procurement Procedures should be directed to: Daemien Jones, CPPB, Purchasing Administration Coordinator, Phone: (703) 791-8744, Fax: (703) 791.8610, E-Mail: jonesdj@pwcs.edu SCOPE OF CONTRACT: Contractor shall provide all necessary labor, parts, tools, permits, materials, equipment, delivery and resources as may be required for the complete permitting, furnishing, installation and commissioning of Traffic Signals at the Intersections Limestone Drive and Wentworth Green Drive. All work shall be completed in accordance with the specifications, terms and conditions stated herein and as shown and described on the drawings prepared by Gorove Slade, County Project SPR2020-00210 dated August 24, 2021 and Virginia Department of Transportation approved on September 13, 2021. 5.1. The Contractor shall obtain and pay for all applicable permits prior to beginning any work. 5.2. The Contractor shall request all applicable inspections as required by local, state and/or federal codes and regulations. 5.3. At the discretion of the PWCS Project Manager, any employee of the contractor/Subcontractor may be removed, with or without cause, from any project. 5.4. The Contractor shall designate a Job Manager who shall be on site during any work being performed. The Project Manager shall communicate to the Contractor through the Contractor's Job Manager. 5.5. The Contractor shall not act on requests or take direction from anyone except the designated Project Manager. Any additional work which is outside the scope of this contract, or any time extensions shall be approved by the Project Manager prior to starting the work. 4 5.6. The Contractor shall provide sufficient protection for all structures at the site. 5.7. The Contractor shall maintain a sufficient supply of manpower and equipment to complete the project in a safe and timely manner. 5.8. Contractor shall make the areas safe at the end of each work shift. 5.9. The Contractor shall promptly remove from the premises all work and/or materials condemned by PWCS as failing to conform to the contract, whether incorporated or not, and the Contractor shall promptly replace and re-execute condemned work in accordance with the contract and without expense to PWCS and shall bear the expense of making good all work of other Contractor destroyed or damaged by such removal or replacement. VDOT REFERENCE NO SPR2020-00210 S02

Award

Roads / Highways

$374,672.00

Public - County

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
79
Bidding Soon
1,897
All Active Projects
751
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2021

January 17, 2022

img_map_placeholder

Limestone Dr & Wentworth Green Dr, Gainesville, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.