BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Salt Lake City, Utah. Working plans call for the renovation of a educational facility; and for site work for a educational facility.

FLCC: $1,974,639 Q & A deadline: Feb 10, 2022 5:00:00 PM CST All questions must be directed to: Jayne McDonough, 801-587-5947, Jayne.mcdonough@utah.edu The Contractor for the project must be a Utah licensed General Contractor. Association with other individuals or firms having appropriate professional expertise is acceptable. The University will enter into a single agreement with the successful Contractor. A Bid Bond in the amount of five percent (5%) of the FLCC, made payable to the University of Utah shall accompany the cost proposal. Effective September 10, 2018, the University has retired the previous state mandated Surety Bond Forms and is now requiring the use of the AIA Bid Bond Form A310-2010 and Performance and Payment Bond Form A312-2010. The University of Utah reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the University. This project will relocate Cardiovascular Prep & Recovery to the shelled space of University Hospital, building 525, level 4 Infill. The space left vacant will be remodeled into Inpatient Beds for CVMU. Phase 1: Provide new construction in existing shelled space including: (10) Prep & Recovery Bays including (3) High Acuity Bays and (1) Isolation Bay (room); (3) Recliner Bays; Nutrition/Supply Room; Soiled Hold; Clean Supply; (2) Toilet Rooms; Nurse Station & Medication Room. Each room or space will be fitted with required finishes, equipment, furniture, cabinets, power, data, mechanical, and plumbing. Gross Area is 2,865 SF Phase 2: Backfill Remodel: After the department moves into the new space, selective demolition will start on the old cardiac prep and recovery space. The remodel shall include (5) Inpatient Beds; (5) Inpatient Toilet, Shower rooms and a waiting area. Each room will be fitted with required finishes, equipment, furniture, cabinets, power, data, mechanical, and plumbing. Gross Area is 2,050 SF

Final Planning

Medical

$1,974,639.00

Public - State/Provincial

Renovation, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
34
Bidding Soon
547
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2022

June 1, 2022

img_map_placeholder

50 Medical Dr N, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.