BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 12, 2023 at 8:00 PM

Updated December 3, 2024

Renovation of a mixed-use development in Greenville, North Carolina. Completed plans call for the renovation of a educational facility.

The method of contractor selection has not been determined at this time. Eakin Student Recreation Center HVAC and Gym Floor Replacement The scope for this phase of repairs includes replacing two air handling systems serving the pool and the gym floor area, and the addition of low-level exhaust in the pool area. Once the air handling systems have been replaced and are in operation, the gym wood floors will be replaced.

Post-Bid

Fitness / Rec Centers

$4,200,000.00

Public - State/Provincial

Renovation

28

18

2

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
78
Bidding Soon
913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2023

December 1, 2023

Project location map

128 E 7th St, Greenville, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.