BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2022 at 7:00 PM

Updated January 26, 2024

Site work and asbestos abatement for a multi-residential development in Pueblo, Colorado. Completed plans call for site work for a multi-residential development; and for asbestos abatement for a multi-residential development.

SCOPE OF PROJECT 1. Asbestos removal in thirteen (13) buildings; 16-A, 40-A, 38-C, 39-C, 15D, 14-E, 2-F, 41-F, 42-F, 17-G, 43-I, 45-I & 46-I (76) apartments. (See attached Asbestos Abatement Scope of Work). All buildings to be vacant at time of abatement. Building to be demolished under separate contract. 2. Buildings (14-E (1), 15-D (2), 16-A (3) and 17-G (4)) located in area of operations North shall have asbestos abatement completed prior to any other buildings scheduled. The abatement and air test must be completed within the first forty calendar days of the contract. 3. Remove non-friable, asbestos-containing 12"x12" floor tile and mastic. Re: Deduct Alternate #1 4. All exterior Sealant is homogeneous for all buildings and is considered Non-Friable ACM. 5. All ACM waste must be disposed of at an approved asbestos waste disposal site. 6. Owner will allow for Contractor application of Building Owners Asbestos Abatement Project Manager Waiver application. 7. Selective demolition performed by Abatement Contractor to include exposing Asbestos Containing Materials behind furred walls and ceilings. Construction materials, appliances, water heaters, cabinets, plumbing and mechanical equipment to be disposed of offsite. Re: Sheet A1, Typical Building Sections. 8. Owner to pay for air clearance air testing (Conducted by the owner's representative). Contractor to schedule and coordinate testing. If air clearance don't pass final clearances contractor to pay for retesting. 9. Contractor to pay for and secure local and state demolition notification application, permits and fees.

Under Construction

Multi-Residential

$1,700,000.00

Public - City

Asbestos Abatement, Site Work

4

6

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
7
Bidding Soon
265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

January 3, 2022

Project location map

2619 Crawford St, Pueblo, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.