BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a multi-residential development in Pueblo, Colorado. Completed plans call for site work for a multi-residential development; and for asbestos abatement for a multi-residential development.

SCOPE OF PROJECT 1. Asbestos removal in thirteen (13) buildings; 16-A, 40-A, 38-C, 39-C, 15D, 14-E, 2-F, 41-F, 42-F, 17-G, 43-I, 45-I & 46-I (76) apartments. (See attached Asbestos Abatement Scope of Work). All buildings to be vacant at time of abatement. Building to be demolished under separate contract. 2. Buildings (14-E (1), 15-D (2), 16-A (3) and 17-G (4)) located in area of operations North shall have asbestos abatement completed prior to any other buildings scheduled. The abatement and air test must be completed within the first forty calendar days of the contract. 3. Remove non-friable, asbestos-containing 12"x12" floor tile and mastic. Re: Deduct Alternate #1 4. All exterior Sealant is homogeneous for all buildings and is considered Non-Friable ACM. 5. All ACM waste must be disposed of at an approved asbestos waste disposal site. 6. Owner will allow for Contractor application of Building Owners Asbestos Abatement Project Manager Waiver application. 7. Selective demolition performed by Abatement Contractor to include exposing Asbestos Containing Materials behind furred walls and ceilings. Construction materials, appliances, water heaters, cabinets, plumbing and mechanical equipment to be disposed of offsite. Re: Sheet A1, Typical Building Sections. 8. Owner to pay for air clearance air testing (Conducted by the owner's representative). Contractor to schedule and coordinate testing. If air clearance don't pass final clearances contractor to pay for retesting. 9. Contractor to pay for and secure local and state demolition notification application, permits and fees.

Under Construction

Multi-Residential

$1,700,000.00

Public - City

Asbestos Abatement, Site Work

4

6

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
9
Bidding Soon
202
All Active Projects
86
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

January 3, 2022

img_map_placeholder

2619 Crawford St, Pueblo, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.