BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Work to be done under the Contract shall consist of: (a)Asphalt Reconstruction and Associated Work (i) Erin Street from Wolever Avenue to Notre Dame Avenue The major components of the Work are as follows: (a)Asphalt Reconstruction and Associated Work (i)Removal of Existing Pavement; (ii) Excavation; (iii)External Point Sewer and Manhole Repairs; (iv)Installation of catch basins and sewer service pipe; (v) Watermain Service Insulation; (vi)Compaction of sub-grade; (vii)Installation of subdrains; (viii)Placement of separation/ filtration geotextile fabric and Class A geogrid; (ix)Placement of sub-base and base course (Granular A) materials; (x) Adjustment of existing manholes and appurtenances; (xi)Installation of Traffic Signals conduit, service boxes, and concrete bases; (xii)Construct monolithic concrete barrier curb with splash strip for asphalt pavement (180 mm height) and modified barrier curb; (xiii)Construction of 250 mm Plain Dowelled (31.8 mm dowels) and 200 mm Reinforced Concrete Pavements (xiv)Construction of Monolithic Concrete Median Slabs and Bullnoses; (xv)Construction of 100 mm Concrete Sidewalk with Block Outs for Paving Stone Indicator Surface; (xvi)Installation of Paving Stone Indicator Surfaces; (xvii)Installation of detectable surface warning tiles; (xviii)Placement of Asphalt Pavement (Type 1A thickness 50 mm (1 lift), Type III thickness 140 mm (2 lifts)); and (xix)Topsoil and Sod. The Contractor shall not commence the Work on the Site before May 16, 2022, and shall commence the Work on Site no later than May 24, 2022, as directed by the Contract Administrator and weather permitting. 2022 Work (Wolever Avenue to Sargent Avenue) shall be completed by October 14, 2022. This shall include Stages 1 thru 6, inclusive, as shown on the Drawings. The Contractor shall not commence the 2023 Work (Sargent Avenue to Notre Dame Avenue) before May 15, 2023, and shall commence the Work no later than May 22, 2023, as directed by the Contract Administrator and weather permitting. Official bid documents must be obtained from Merx and bid submissions must be done through the Merx platform.

Award

Roads / Highways

$9,731,095.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
51
Bidding Soon
530
All Active Projects
232
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2021

May 16, 2022

May 22, 2023

img_map_placeholder

Erin St, Winnipeg, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.