BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Portland, Maine. Completed plans call for the renovation of a transportation facility.

The Scope of Work, Without Limiting the Generality Thereof, Consists of Furnishing All Labor, Materials, Equipment and Performing All Operations in Connections With Roofing Per Attached Specifications and Drawings. The Project area is located on the Roof of the terminal building next to an active commercial airline apron. While the roof is not part of the secured area, it is adjacent to the secured area therefore subject to heighted awareness of Portland Jetport, TSA and FAA security measures . Access to the roof area will be from within the terminal building through the stairway tower and mechanical room. Access is limited through this area for personnel and tools only and will require coordination with Jetport operations. Materials will require the use of a small crane/lift to place the roofing and associated materials on the roof repair area. This is expected to occur from the active commercial aircraft apron that is within the secured area of the airport. As a result, timing of materials delivery must be coordinated with Jetport Operations to avoid impacts to the commercial air carriers and operations. All vehicles must be escorted by Jetport personnel and subject to TSA, FAA, Jetport and Portland Police inspections. Bid security in the amount of five percent (5%) of the total bid must be submitted with the bid. The bid security may be either a certified check (only if the bidder utilizes in-person submission, USPS, UPS, or FedEx to submit their bid) or a proposal guaranty bond executed by a surety company authorized to do business in the State of Maine (for electronic bid submissions). Bid security shall be made payable to the City of Portland, Maine. Bids submitted without security will not be considered. Each prospective bidder will be required to obtain from the City each copy of the proposal form and each set of plans. The successful bidder must furnish: A 100% performance bond, A 100% labor and material payment bond Questions or concerns about the bid document must be submitted in writing to the Purchasing Office and be received no later than five business days prior to the bid due date these may be faxed to 207.874.8652 or e-mailed to krc@portlandmaine.gov. Bids shall remain open to acceptance for ninety (90) days from their opening. Bids from vendors not registered with the Purchasing Office may be rejected; receipt of this document directly from the City of Portland indicates registration. Should a vendor receive this Request from a source other than the City, please contact 207-874-8654 or jrl@portlandmaine.gov to ensure that your firm is listed as a vendor for this Bid. Please also include a copy of your companys most recent W-9. Hard copy bids must be submitted in a sealed envelope endorsed with the name and address of the bidder. The outside of the envelope shall be clearly marked as follows . The Owner may make such investigations as he deems necessary to determine the ability of the Bidder to perform the Work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligation of the Agreement and to complete the Work contemplated therein. The Owner reserves the right to reject any bid items he desires. The undersigned should submit answers to the following questions to enable the City or Portland to judge of his/her experience and ability in and facilities for the work proposed to be done. The City reserves the right to reject any bid if the bidder fails to satisfy the City that such bidder is properly qualified. Work shall be completed no later than May 19, 2023. Liquidated damages will not be assessed, however, if this date is not achieved due to the critical nature of the airport operations the owner reserves the right to withhold money from the Contractor until such work is completed to the satisfaction of the owner. The AHU shall not be off-line for more than 30 calendar days during this period. Note that the penthouse also contains boilers and other heating systems that will remain operational during the work. As a result, the contactor shall be responsible for temporary heat and wall closures to ensure the boilers and vulnerable systems do not freeze during winter construction. Should the bidder fail to fulfill any of this agreement as hereinabove set forth, the Owner shall have the right to retain as liquidated damages the amount of the Proposal Guaranty which shall become the Owners property. Liquidated damages will not be assessed, however, if this date is not achieved due to the critical nature of the airport operations the owner reserves the right to withhold money (amount as determined by the owner) from the Contractor until such work is completed to the satisfaction of the owner. The time set for such completion may be extended only by the written consent of the Airport Director or his/her authorized representative, hereinafter jointly referred to as the Responsible City Official. Violation; Liability for Unpaid Wages; Liquidated Damages. In the event of any violation of the clause set forth in paragraph (1) of this clause, the Contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this clause, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this clause. Withholding for Unpaid Wages and Liquidated Damages. The Federal Aviation Administration (FAA) or the Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2) of this clause

Award

Transportation Terminals

$1,485,000.00

Public - City

Renovation

63

36

6

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
28
Bidding Soon
736
All Active Projects
247
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.