BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Nebo, North Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; and bridge / tunnel.

Award Details Contract Award Date: Mar 28, 2022 Contract Award Number: 12445122C0006 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 195374264 Contractor Awarded Unique Entity ID (SAM): PFLAXLXEQK99 Contractor Awarded Name: TAG Contracting, Inc. Contractor Awarded Address: Marion, NC 28752-7609 USA Base and All Options Value (Total Contract Value): $1478001.10 Project Title: USDA-FS Pisgah National Forest NC, Catawba Falls Trail Visitor Safety Improvements Original Set Aside: Total Small Business Set-Aside (FAR 19.5) NAICS Code: 237310 Highway, Street, and Bridge Construction PSC: Z2PA Maintenance, Repair or Alteration of Recreation Facilities (Non Building) Type of Contract: This is a Request for Proposal (RFP) which will result in award of a firm-fixed price contract. Award will be made using a Lowest Price Technically Acceptable (LPTA) source selection process considering technical qualifications, past performance, and price. Magnitude: In accordance with FAR 36.204, the magnitude of this project is: (e) Between $500,000 and $1,000,000. Location: The project area is located near the Catawba River in the Grandfather Ranger District of the Pisgah National Forest in McDowell County, near Old Fort North Carolina. The trailhead is at the end of Catawba River Road (35.613367, -82.230645). Scope of Work: There is a need to improve the trail to enhance user safety and reduce impacts to the Catawba River. Some parts of the Catawba Falls Trail are excessively steep and pose a hazard to trail users. This project includes slide repair with a retaining wall, native surface trail construction, boardwalk construction, staircase construction, and elevated viewing platform construction, etc. Features will be constructed from cast in place concrete, gabion, wood, and steel, some of which may require off-site fabrication. The project is area is in a remote location with challenging conditions requiring crossing streams/rivers, limited construction access, rock slope conditions, high public use, slope reinforcement, bridges, etc. Catawba Falls Trail is a 1.3-mile trail which begins at the trailhead, parallels Catawba River to lower Catawba Falls, and ends at upper Catawba Falls. Portions of the existing trail are on an old roadbed, others are through boulder fields adjacent to the river, and the final sections traverse steep slopes adjacent to the lower falls. Improvements in this contract end near the lower falls, and do not include the entire trail leading to upper Catawba Falls. Dates: Site Visit: 11 Jan 2022 - RSVP MANDATORY Last Day for Questions: 04 February 2022 Proposals Due: 18 February 2022; 1300ET Period of Performance: anticipated 03/14/2022 to 03/13/2023 (based upon NTP issue date) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Phase 0, Slide 2 (Base Bid #1): This segment consists of construction of a micro-pile retaining wall torepair one of two landslides. See the included preliminary geotechnical engineering report for site specific conditions at each slide location. Phase 1A (Base Bid #2): This trail segment begins at the end of the second bridge (over Chestnut Branch) and ends at an observation platform atop a rock outcrop, which is adjacent to lower Catawba Falls. Work in this segment includes construction of native surface trail, obliteration of existing native surface trail, and construction of stairs, elevated boardwalks, and viewing platforms. Phase 1B (Optional Bid #1): This trail segment begins at the end of Phase 1A and includes construction of stairs, elevated boardwalks, and a freestanding stair tower with an observation platform at the top. The stair tower will be constructed of galvanized steel. Stair tower design shall be done by a NC licensed professional engineer and require USFS approval of shop drawings per supplemental specifications. Stair tower design will accommodate offsite fabrication of modular components for efficiency in transport to the construction site. MBE (2.2%), WBE (6.9%), SBE (100%) CG2 Project No.: 240021096

Award

Roads / Highways

$1,478,001.00

Public - Federal

Paving, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
62
Bidding Soon
1,035
All Active Projects
466
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2022

March 14, 2022

img_map_placeholder

Catawba River Road, Nebo, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.