BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in New Orleans, Louisiana. Completed plans call for the renovation of a transportation facility.

The City of New Orleans (City) and New Orleans Aviation Board (NOAB) solicit bids to obtain an emergency contract for Modified Bituminous Membrane Roofing and Built-Up Asphalt Roofing at the South Terminal of the Louis Armstrong New Orleans International Airport (Airport) to mitigate further damage initially caused by Hurricane Ida. The requested services include (but are not limited to) the following: 1. The contractor to whom the contract is awarded (the Contractor) will be responsible for the gathering, loading, hauling, and disposing of the identified Modified Bituminous Membrane Roofing, flashing, gutters, coping, etc. and Built-Up Asphalt Roofing at the locations described below. Standard safety procedures shall be implemented, and qualified personnel shall be contracted, to successfully complete all tasks. All work shall be completed within 60 calendar days of issuance of Notice To Proceed (NTP). 2. All dimensions are approximate. Contractor is to verify all dimensions and estimated quantities. 3. Contractor to submit before and after pictures of the work areas. Include Latitude and Longitude coordinates on pictures of each work area. 4. Below are the locations of roof to be replaced. 5. Procurement of all necessary permits and AHJ approvals for the completion of the work 6. Coordination with tenants and owners for access and staging. 7. Disposal or recycling of all demolished building materials and building contents. Hazardous materials will be properly disposed per environmental guidelines at authorized collection centers. Primary and secondary routes should be considered when hauling and disposing of debris to and from collection centers. Contractor shall provide proof of proper disposal (Receipts, landfill tickets, etc), prior to release of final payment. 8. Access to the airside work areas shall be through Gate 167. SIDA badging and operational requirements and restrictions while working on an active airfield will be enforced. Standard safety procedures shall be implemented, and qualified personnel shall be contracted, to successfully complete all tasks. All work shall be completed within 60 calendar days of issuance of Notice To Proceed (NTP). 9. Refer to Exhibit 1 - Specifications for additional requirements

Post-Bid

Transportation Terminals

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
49
Bidding Soon
494
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

January 17, 2022

img_map_placeholder

To Be Determined, New Orleans, LA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.