BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2022 at 7:00 PM

Updated November 14, 2023

Demolition, site work and new construction of a water / sewer project in Lima, Ohio. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

The proposed work consists of replacing an existing submersible pump station located in the park:complete with all related items as shown in the Contract Documents and called for on the Proposal for Unit Price Contract. Each bid shall contain the full name of each person or company interested and shall be accompanied by a bond or certified check made payable to the Board of Allen County Commissioners, equal to at least ten (10%) percent of the bid upon the condition that if the bid is accepted, a contract will be entered into within ten (10) days. A performance bond of one hundred (100%) percent of the amount of the contract, with satisfactory corporate sureties, will be required for the faithful performance of the work. This Project is being constructed, in part, with Federal Community Development Block Grant funds. This Project will be subject to Federal Prevailing Wage Rates. It will also be subject to all applicable Federal Equal Opportunity Laws, and related regulations. Bids shall be sealed and endorsed Park Pump Station Replacement, FY20 CDBG Allocation,Allen County, Ohio, and addressed to the Board of Allen County Commissioners. No proposal will be entertained unless made on the blanks attached to the bound documents furnished by Access Engineering Solutions. Sealed bids must contain an original and one (1) copy of the Bid submission. The bidder's attention is called to the necessity of starting the work at once upon written Notice to Proceed.All work shall be completed by August 31, 2022. No bidder shall be permitted to withdraw his bid for a period of thirty (30) days after the time of opening bids. The Board of Allen County Commissioners reserves the right to accept or reject all proposals or to waive all informalities or irregularities in the bidding. This Contract will be awarded based on the lowest and best bid or the lowest responsible bid as approved by law

Award

Water / Sewer

$173,600.00

Public - County

Demolition, New Construction, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
62
Bidding Soon
1,807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

January 17, 2022

Project location map

To Be Determined, Lima, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.