Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Midland, Michigan. Completed plans call for the renovation of a educational facility.

Questions should be referred to Michael Moeggenberg, Director of Facilities and Operations at 989-923-5035 or moeggenbergmj@midlandps.org. 1. Remove rock, tear off all roofing membrane, flashings down to the roof deck and dispose of legally. 2. Remove any items identified by the owner as abandoned and dispose of legally. 3. Furnish and install 2 layers of new 2.6 Firestone ISO mechanically attached on metal deck areas. 4. Furnish and install a new 1/8" per foot Tapered ISO system fully adhered with Firestone insulation adhesive. 5. Furnish and install new fully adhered 90 mil EPDM. Provide all necessary details at projections, flashings, drains etc for a complete watertight system. 6. Furnish and install new ANSI/SPRI ES 1 kynar coated steel edge metal system gravel stop Firestone Anchor guard where applicable. 7. Provide a full system Firestone Red Shield 30 year warranty. 8. Alternate for fully adhered .060 EPDM 30 year system following the same procedures as the system listed above. A. Work under this section covers the installation of a new Firestone Platinum Roofing System on (Midland Public Schools Northeast Middle School). In addition, contractor shall include all related items of work as noted herein or indicated on the drawings or otherwise required to complete the specified elements of work and provide the necessary warranties for this work. B. Contractor will dispose of all materials properly. Any asbestos removal shall comply with state and local codes and requirements and shall be disposed of in a legal manner. C. Contractor shall remove the existing roof down to the roof deck including all existing composition base flashings. Contractor will dispose of all materials properly. Any asbestos removal shall comply with state and local codes and requirements and shall be disposed of in a legal manner.

Bid Results

Educational

$120,679.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
122
Bidding Soon
1,455
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2021

June 1, 2022

Project location map

1305 E Sugnet Rd, Midland, MI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed