Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, new construction and renovation of a mixed-use development in Detroit, Michigan. Completed plans call for the renovation of a one-story above grade office development; for the demolition of a office development; for the construction of a office development; for site work for a office development; and water / sewer project.
This is a Request for Bid ("RFB") issued by the Great Lakes Water Authority ("Owner" or "GLWA") seeking bids from experienced and qualified vendors to renovate the existing fourth floor of the Owner's New Administration Building and to consolidate the Design Engineering, CSO Engineering, Construction Engineering, Document Control and Local Asset Management Groups in one location (referred to herein as the "Project"). Questions Due Date: Jan 4th 2022, 12:00 PM EST Term Contract: Twelve (12) Months Substantial Completion shall be 14 months from the start date specified in the Notice to Proceed. Final Completion shall be 20 months from the start date specified in the Notice to Proceed. Owner may, without invalidating the Contract Documents, order changes in the Work (including extra Work, less Work, or alterations) and such changes, regardless of their scope or number, are within the contemplation of the Parties. Changes in the Work shall be ordered only by Change Order or Construction Change Directive. Changes in the Work may be made without notice to any Sureties, and absence of such notice shall not relieve such Sureties of any of their obligations to Owner. A Change Order shall be mutually agreed upon by the Parties. A Change Order may result from a Construction Change Directive. Agreement on any Change Order shall constitute a final settlement and waiver of, and permanent bar to all claims and matters relating to the change in the Work which is the subject of the Change Order, including all direct and indirect costs associated with such change and all adjustments to the Contract Price, any Key Completion Times and Contract Time and shall entitle Contractor to payment for the Work covered thereby. Contractor shall include the Work covered by such Change Orders in its Applications for Payment as if such Work were originally part of the Contract Documents. Contractor shall proceed promptly with any Work authorized under any Change Order upon approval thereof. A Construction Change Directive may be issued by the Contracting Officer and may or may not be mutually agreed upon by the Parties. A Construction Change Directive signed by Contractor indicates Contractor's agreement with its terms. A mutually agreed upon Construction Change Directive shall be immediately effective and binding on the Parties and shall, on or before issuance of Final Payment, be incorporated into a Change Order. In the case of disagreement as to the terms of the Construction Change Directive including the amount to be adjusted, credited, or paid for changed Work, Contractor shall nevertheless promptly comply with the Construction Change Directive, and payment or credit shall be made in accordance with the Contract Documents up to the reasonable estimated value of the change as determined by Owner. A Construction Change Directive shall not be used to change any Key Completion Times, the Contract Time or the Contract Price. A Construction Change Directive may be used to (i) order changes in the Work which do not affect the Contract Price; (ii) authorize the use of or the reallocation of the funds of any Allowance; (iii) adjust quantities of, establish, or change (subject to Section 11.2.3) unit prices which do not affect the Contract Price; and (iv) authorize the reallocation of funds between lump sum line items. Contractor shall proceed promptly with the changes in the Work authorized by any Construction Change Directive, unless otherwise stated in the Construction Change Directive.
Bid Results
Office
$3,194,503.00
Public - City
Demolition, New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2022
March 10, 2022
Multiple Locations, Detroit, MI
Related To This Project
Detroit, MI
Bid Date: Feb 10 2022
Detroit, MI
Bid Date: Feb 08 2022
Detroit, MI
Bid Date: Nov 30 2021
Detroit, MI
Bid Date: Feb 07 2022
Detroit, MI
Bid Date: Jan 28 2022
Detroit, MI
Bid Date: Mar 04 2022
Detroit, MI
Bid Date: Feb 23 2022
Detroit, MI
Bid Date: Sep 08 2021
Detroit, MI
--
Detroit, MI
Bid Date: Feb 11 2022
Detroit, MI
Bid Date: Jan 19 2022
Detroit, MI
Bid Date: Feb 14 2022
Detroit, MI
Bid Date: Feb 15 2022
Detroit, MI
Bid Date: Feb 15 2022
Detroit, MI
Bid Date: Feb 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.