Renovation of a water / sewer project in Huntingdon, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

As of 1/17/2022 project was already awarded. Notice of Intent to award to Ferri Contracting, Inc. in the amount of $1,105,000.00 plus bid alternates (Cont. No. 4: G-M Work) and D&M Electrical & Automation in the amount of $186,365.00 plus bid alternates. The project engineer is Christopher Eckenrode and the estimate is $885,000. Bids will be received as single prime Contracts. Bids shall be on a lump sum basis as indicated in the Bid Form. The Issuing Office for the Bidding Documents is: Gwin, Dobson & Foreman, Inc., 3121 Fairway Drive, Altoona, PA 16602, (814) 943-5214. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 AM and 5:00 PM, and may obtain copies of the Bidding Documents from the Issuing Office as described below. Bidding Documents also may be examined at plan holding sites and websites indicated in the Instructions to Bidders; the office of the Alexandria Borough Water Authority, 7561 Bridge Street, Suite 3, P.O. Box 336, Alexandria, PA 16611 on Mondays through Fridays between the hours of 9:00 AM and 1 :00 PM; and the office of the Engineer, Gwin, Dobson & Foreman, Inc. at 3121 Fairway Drive, Altoona, PA 16602, on Mondays through Fridays between the hours of 8:00 AM and 5:00 PM. Bidders are advised that this project is being financed by the Pennsylvania Infrastructure Investment Authority (PENNVEST). The attention of the Bidders is also directed to the Disadvantaged Business Enterprise (DBE) and the Super Cross Cutter Requirements for Construction Projects funded under the PennVEST Clean Water and Drinking Water State Revolving Fund loan programs. Bidders must submit DBE contact and commitment documentation with the Bid. Funding for this project originates from USEPA financial assistance dollars. Therefore, all contractors must demonstrate compliance with federal Executive Orders 11625, 12138 and 12432 and EPA Regulations at 40 CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services and supplies by including state qualified small businesses and minority and women owned business enterprises in the bidding process. Notice is given that not less than the minimum wage rates set forth in the Contract Documents must be paid to employees on this project in accordance with the US Department of Labor Davis-Bacon Wage Rates. The Contractor is subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended as well as American Iron and Steel Requirements as amended. The Act and amendments require that the Contractor use or furnish only steel products (as defined in the Act and amendments) which have been produced in the United States. Each bid must be accompanied by a Certified or Bank Check; or Bid Bond naming as payee or obligee (as applicable), the Alexandria Borough Water Authority, in the amount of five percent (5%) of the total amount of the bid as security for proper execution of the Agreement and submitting other documents as required by the Bidding Documents. No bids may be withdrawn, except when the Bidder(s) comply with the withdrawal requirements of Act No. 4 of the General Assembly of Pennsylvania, Senate Bill 793, Printers No. 1655, as amended. The Successful Bidder will be required to execute the Agreement and to furnish a performance and payment bonds, each of said bonds to be in the amount of one hundred percent (100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Bidding Documents. All bonds shall be executed by sureties named in "Circular 570 - Companies Holding Certificates of Authority as Acceptable Sureties in Federal Bonds and as Acceptable Reinsuring Companies" (current publication) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department. Alexandria Borough Water Authority reserves the right to reject any or all bids or parts thereof or items therein, to waive any defects or irregularities in the Bids, and to accept any Bid which, in its judgment, is for its best interest. Bids shall remain open for a period of sixty (60) days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of one hundred twenty (120) days from the date of Bid opening. The Project consists of piping and instrumentation upgrades, microfiltration system and chemical feed system upgrades, pump replacements, HVAC, plumbing and electrical upgrades, and associated required appurtenances. Bid Results Contract No 4 - General Mechanical Work - Ferri Contracting, Co., Inc - $1,105,000.00 Contract No 5 - Electrical Work - D&M Electrical and Automation, Inc. - $186,365.00

Award

Water / Sewer

$1,291,365.00

Public - City

Renovation

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Field Samples, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Temporary Ramps, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Castings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Flooring, Specialty Flooring, Laminate Flooring, Carpeting, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Equipment, Common Work Results for Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 12 - Furnishings

Division 12 - Furnishings

Art, Sculptures, Cast Sculpture, Furnishings and Accessories, Furnishing Accessories, Bowls, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Amusement Park Structures and Equipment, Wave Generating Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, Refrigerant Piping, Refrigerant Piping Specialties, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Decentralized HVAC Equipment, Humidity Control Equipment, Dehumidifiers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Public Address and Mass Notification Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Lifts, Slings
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment, Liquid Process Equipment, Liquid Aeration Devices
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
43
Bidding Soon
651
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2021

January 28, 2022

img_map_placeholder

To Be Determined, Huntingdon, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Treatment Facility Improvements Contract No. 4: General-Mechanical Work Contract No. 5: Electrical Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.