BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in University Heights, Ohio. Completed plans call for the renovation of a educational facility.

Project Construction Schedule: Earliest Start Date: June 6, 2022 Substantial Completion Date: August 12, 2022` Final Completion August 19, 2022 Boulevard Elementary School Roof Replacement (Roof Section C) $158,580.00 Heights High School Roof Replacement (Roof Sections H, J, M-1) $108,700.00 Heights High School Roof Replacement (Roof Sections L & S) $295,000.00 Noble Elementary School Roof Replacement (Roof Sections A, F, & G) $285,636.00 Noble Elementary School Roof Replacement (Roof Sections J, K, L, & H) $45,394.00 Oxford Elementary School Roof Replacement (Roof Sections D & J) $11,832.00 Roxboro Middle School Roof Replacement (Roof Sections C, D, & F) 285,636.00 Roxboro Middle School (Roof Section A) $84,060.00 Roxboro Middle School (Roof Section B) $151,200.00 1. Project Drawings TS-1, RC-1, RC-2, RC-3, and RC-4 are for contractor reference only. Contractor shall visit the site, analyze, and measure specific work items and otherwise be knowledgeable of the roofing work required. 2. All staging, scaffolding and erection necessary to complete specified Roof Replacement Project, including properly barricading staging work areas with temporary fencing and protecting building materials from damage at all times. 3. Contractor must keep the grounds clean. Any damage to the green belt area or surrounding pavement shall be the sole responsibility of the Contractor. Special care shall be taken during the demolition phase to minimize the level of debris accumulation. Dumpsters, bathroom facilities, and ground material storage shall be located within the construction staging area. 1. Existing Roof System Make Up (Roof Section C): a. Concrete Deck b. 1.5" Perlite c. 4-ply Built-up Roof / Gravel Surface d. Lightweight Concrete Fill e. 2- Ply Modified Bitumen Roof System 2. Removal of the flashing membrane (perimeter and curbs) and sheet metal systems down to the existing concrete substrate. Contractors must keep the grounds clean. Any damage to the green belt area shall be the sole responsibility of the Contractor. 3. Repairs must be made to any surface condition that will not allow the new roof system to lie flat. The deck must be clean and smooth prior to the installation of the new roof systems. 4. Existing Modified Bitumen blister repair and repairs must be made to any surface condition that will not allow the new roof coating system to lie flat. The roof must be clean and smooth prior to the installation of the new roof systems. (Refer to Allowance Schedule) 5. Prepare existing modified bitumen roof system by removing all dirt, loose granules, debris, biological growth, and other residue that would affect adhesion of the insulation adhesive. 6. Over existing modified bitumen roof system install cover board in insulation adhesive. Bid Results: Boulevard (Roof Section C) Base Bid 1 and 1A: Building Tech 174,200.00 Heights High School (Roof Sections H & J) Base Bid 1 PRS 107,700.00 Heights High (Roof Sections L & S) Base Bid 2 and 2A: Tusing 295,000.00 Noble (Roof Sections A, F, & G) Base Bid 1: Building Tech 312,800.00 Noble (Roof Sections J, K, L, & H) Base Bid 2 PRS 28,700.00 Bid Results: Boulevard (Roof Section C) Base Bid 1 and 1A: Building Tech 174,200.00 Heights High School (Roof Sections H & J) Base Bid 1 PRS 107,700.00 Heights High (Roof Sections L & S) Base Bid 2 and 2A: Tusing 295,000.00 Noble (Roof Sections A, F, & G) Base Bid 1: Building Tech 312,800.00 Noble (Roof Sections J, K, L, & H) Base Bid 2 PRS 28,700.00

Award

Educational

$882,700.00

Public - City

Renovation

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
61
Bidding Soon
925
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2021

June 6, 2022

img_map_placeholder

Multiple Locations, University Heights, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.