BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Baton Rouge, Louisiana. Completed plans call for the renovation of a educational facility.

For Louisiana State University Virtual Production Dispay System Specifications The LSU Virtual Production Program is seeking a curved LED wall for in-camera performance using ROE BP2V2 (or equivalent) tiles with the following requirements. We are seeking a supplier that has extensive experience in mainstream screen-based media (film, television and streaming) development for virtual production to design, build, install the LED wall, and train faculty and staff on operation of this wall.

Award

Educational

$256,723.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
140
Bidding Soon
1,023
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

January 10, 2022

Project location map

213 Thomas Boyd Hall, Baton Rouge, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.