Site work for a transportation facility in Rocky Mount, North Carolina. Completed plans call for site work for a transportation facility.

The project will include clearing and grubbing, wetland clearing, isolated tree removal, individual tree topping, and installation and upkeep of erosion control measures. The purpose of this meeting is to familiarize the prospective bidders with the proposed project, bid requirements, and to answer any questions from potential bidders. Attendance at this Pre-Bid Conference is highly encouraged, but not required for all bidders intending to submit a prime bid on this project. All other interested parties including, but not limited to, subcontractors, suppliers, and vendors are welcome to attend. Address questions regarding this Notice in writing to: Jason Elliott, P.E., Project Manager W.K. Dickson & Co., Inc. 720 Corporate Center Drive Raleigh, NC 27607 jelliott@wkdickson.com All Contractors are hereby notified that they must have proper licenses under the state law for their trades. General Contractors are notified that applicable statues of North Carolina will be observed in receiving and awarding general contracts. The State Department of Transportation and the United States Government have agreed to reimburse the Owner for portions of the project costs. The Owner will not accept or consider proposals from any contractor whose name, at the time of opening of bids or award, appears on the current list of ineligible contractors published by the Comptroller General of the United States under Section 5.6 (b) of the Regulations of the Secretary of Labor (29) CFR nor a proposal from any firm, corporation, partnership, or proprietorship in which an ineligible contractor who, at the time of the opening of bids or the award, is removed from the North Carolina Department of Transportation's list of prequalified contractors. Contractors desiring to perform work on NCDOT projects shall pre-qualify with the Department. Upon pre-qualification, Contractors will be placed on the Department's Prequalified Bidders List and/or the Approved Subcontractors List, depending on the application submitted. The requirements for pre-qualification are listed in section 102-2 of the Standard Specifications for Roads and Structures, January 2018. For more information please refer to the NCDOT website. Bidders must be prequalified by the NCDOT prior to submitting a bid. Subcontractors performing work on this project must be prequalified prior to performing any work on this project. Each proposal shall be accompanied by a cash deposit or a certified check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation in an amount equal to not less than 5% of the proposal or a bid bond of 5% of the bid executed by a surety company licensed under the laws of North Carolina to execute such bonds. The deposits shall be made payable to the Owner and shall be retained by the Owner as liquidated damages in the event of the successful bidder fails to properly execute the contract within ten (10) days after award and to give satisfactory surety as required by law. By submitting a bid the Contractor certifies that he has under his direct control or at his disposal the men, equipment, and materials required to execute this work as specified. Lack of such control or availability of men, equipment or materials shall constitute failure to properly execute the Contract. Performance and Labor and Material Payment Bonds will be required for 100% of the Contract price, with a surety or sureties legally authorized to do business in the State of North Carolina. A bid may be withdrawn only as provided by the applicable statues of North Carolina. If a bid is withdrawn within 90 days of the bid opening, the Bid Guarantee shall be forfeited; provided that, if the request to withdraw is made not later than 72 hours after the opening of bids, and if the withdrawal is allowed, the Owner may return the bid guarantee. The Special Provisions (SPIG61) of the North Carolina Department of Transportation, apply to this contract. It is the policy of the Tarboro-Edgecombe Airport Authority to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. All firms qualifying under this solicitation are encouraged to submit bids/proposals. Award of this contract will be conditioned upon satisfying the requirements of this bid specification. These requirements apply to all bidders/offerors, including those who qualify as DBE. A DBE contract goal of zero (0%) percent has been established for this contract. The bidder/offeror shall make good faith efforts, as defined in SPIG61 to meet the contract goal by utilizing DBE's in the performance of this contract. The apparent successful bidder will be required to submit in the "Proposal" section of his bid the information concerning the DBE(s) that will participate in this contract. This information will include: (1) the names, addresses and telephone numbers of DBE firms that will participate in the contract, and the certifying agency documentation of current status as a bona fide DBE; (2) a description of the work that each DBE firm will perform; (3) the dollar amount of the participation of each DBE firm participating (4) written documentation of the bidder/offeror's commitment to use a DBE subcontractor whose participation it submits to meet the contract goal; and (5) written confirmation from the DBE that is participating in the contract as provided in the commitment made under (4). If the bidder fails to achieve the contract goal stated herein, he will be required to provide documentation demonstrating that he made a good faith effort. The bidder's documentation shall be submitted in accordance with the provisions of SPIG61. The Owner reserves the right to reject any or all bids and to waive informalities and minor irregularities. Construction Start - NTP anticipated in January 2022 Total construction duration = 45 consecutive calendar days 0% DBE (Disadvantaged Business Enterprise) Goals for minority participation in each trade 31.7% Goals for female participation in each trade 6.9%

Post-Bid

Transportation Terminals

$280,000.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
108
Bidding Soon
1,415
All Active Projects
577
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 17, 2021

January 3, 2022

February 17, 2022

img_map_placeholder

141 Airport Rd, Rocky Mount, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.