Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 4, 2022 at 7:00 PM
Updated November 14, 2023
Site work for a water / sewer project in Leesburg, Georgia. Completed plans call for site work for a water / sewer project.
Construction of water system improvements for Lee County Board of Commissioners & Lee County Utilities Authority. There are three (3) segments to the project located along three different roads. The first is located on the northeast side of US Hwy 82/GA 520 beginning at Oakland Rd and ending at Armena Rd. The second is located on the northeast side of Partridge Drive beginning at US 82/GA 520 and ending at Quail Valley Subdivision section two at the Southern Natural Gas right of way easement. The third is located on the northeast side of Armena Rd beginning at UA Hwy 82/GA 520 and ending at the Woodgrain Millwork driveway on Armena Rd. Total approximate area disturbed is 1.5 acres. SEGMENT 1 (us 82/ga 520) improvements include: .3964 lf 12" c900 pvc water main .730 lf awwa c151 restrained joint di water main.7-fire hydrants.8-12" gate valve & box.1-43 lf & 1-41 lf jack & bore 24" steel casing pipe.Other appurtenances as shown on the plans SEGMENT 2 (partridge drive) improvements include:.1021 lf 8" c900 pvc water main.2-fire hydrants.1-8" gate valve & box.Other appurtenances as shown on the plans SEGMENT 3 (armena road) improvements include:.1045 lf 12" c900 pvc water main.3-fire hydrants.3-12" gate valve & boxother appurtenances as shown on the plans.The Contract includes erosion, sedimentation & pollution control for approximately 1.5-acres of disturbed area. Work shall be in accordance with Drawings, Specifications and other Contract Documents prepared by Lanier Engineering, Inc A bid bond shall be required in the amount of 5% of the total bid amount.A Contract Performance Bond and a Materials and Payment Bond will be required of the successful bidder. The Lee County Board of Commissioners, hereinafter called the Owner, reserves the right to reject any or all Proposals and to waive any formality or technicality and to award the Proposal as may be in the best interest of the Owner, or readvertise for bids. All work on the project must be completed within 90 consecutive calendar days of the commencement of the Contract Time as defined in the General Conditions of the Contract.
Post-Bid
Water / Sewer
$800,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2022
February 7, 2022
Multiple Locations, Leesburg, GA
Related To This Project
Leesburg, GA
Bid Date: Jan 21 2021
Leesburg, GA
Bid Date: Oct 03 2023
Leesburg, GA
--
Leesburg, GA
Bid Date: Sep 21 2023
Leesburg, GA
Bid Date: Dec 05 2023
Leesburg, GA
--
Leesburg, GA
Bid Date: Dec 11 2023
Leesburg, GA
Bid Date: Dec 14 2023
Leesburg, GA
Bid Date: Dec 02 2021
Leesburg, GA
Bid Date: Oct 03 2023
Leesburg, GA
Bid Date: Aug 10 2023
Leesburg, GA
Bid Date: Aug 21 2023
Leesburg, GA
Bid Date: Jun 20 2023
Leesburg, GA
Bid Date: Dec 13 2021
Leesburg, GA
Bid Date: Feb 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
