BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 12, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work and new construction of a service station / car wash facility in Milan, New Hampshire. Completed plans call for the demolition of a service station / car wash facility; for the construction of a service station / car wash facility; and for site work for a service station / car wash facility.

This Project Consists of Construction of a New Vehicle Fueling Facility and Removal of Existing Fueling Facility at the Milan Shed (Ps 106). Bidders Should Act Promptly and Submit All Questions Pertaining to the Project in Writing to Matthew Lampron at Matthew.d.lampron@dot.nh.gov at Least Five (5) Business Days Before the Hour and Date Set for the Bid Opening. No Phone Calls or Faxes Will Be Accepted. All individuals, firms, partnerships or corporations intending to bid, must file a statement showing their qualifications with the Department of Transportation on forms prepared for that purpose at least ten (10) days prior to opening of bids. No authorization to bid will be granted to a prospective bidder not prequalified. Any information submitted as part of the Invitation to Bids may be subject to public disclosure under RSA 91-A. In addition, in accordance with RSA 9-F:1, any contract entered into as a result of the bid letting will be made accessible to the public online via the website Transparent NH. If contract price is $35,000 or more, the successful bidder will be required to furnish electronically, at the time of approval, a contract bond in the amount of One hundred (100) percent of their bid. The right is reserved to waive any informalities in or to reject any or all proposals. NHDOT - Milan This project consists of constructing a new vehicle fueling facility and removing the existing fueling facility at the Milan Shed (PS 106). The Contractor shall provide all labor and materials to complete the work. The scope of work at the facility will include the installation of one (1) 3,000-gallon diesel underground storage tank (UST), one (1) single-hose suction dispenser and fueling pad with pre-manufactured pump enclosure, and all other associated fueling system equipment and appurtenances. The project will also include the removal of one (1) existing 3,000-gallon diesel UST, one (1) existing dispenser and associated fueling pad, and all associated fueling system equipment and appurtenances related to the existing fueling system at this location. Engineered shoring for the tank excavation will be required An EJ Ward representative shall visit the site prior to start-up to make certain that all correct parts are provided for a complete and operational system, and to assist and verify that the system isconfigured and operating properly.

Award

Service Station / Car Wash

$598,800.00

Public - State/Provincial

Demolition, New Construction, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
41
Bidding Soon
875
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

April 6, 2022

Project location map

NH-16, Milan, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.