BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Sedona, Arizona. Completed plans call for the renovation of a water / sewer project.

As of September 2, 2022, an engineer and construction manager have been selected for this project. *The closed solicitation has been included below for reference: “The owner has determined a prequalified list of construction managers." The estimated construction cost range for this project is $2,000,000 - $5,000,000, depending on options chosen. The City of Sedona is seeking sealed Statements of Qualifications (SOQ) for design phase assistance and construction services as a Construction Manager at Risk (CMAR) for the construction of the Major Lift Station Upgrades. Details of the SOQ will not be announced at the time of the opening. Such information shall be made public after all SOQ's are reviewed and evaluated. Evaluation criteria will include previous experience in completing projects of similar size and scope; including but not limited to quality of work, ability to manage costs, ability to maintain project schedule, leadership ability of personnel assigned to the project, and ability to communicate effectively. The City intends to award a single contract to the top respondent. The top respondent will be based on SOQ evaluations alone; interviews will not be held. Respondents are invited, but not required, to be present at the opening. : This project includes improvements to the Brewer, Carrol Canyon, and El Camino lift stations located in the central and western portion of the City of Sedona. The list of improvements includes new PLCs, new VFDs, various valve replacements, new flow and level meters, wet well upgrades, installation of a new hydro tank, procurement and installation of new pumps, and all associated electrical, instrumentation and control work. This project design will be completed by the City's selected design professional, Carollo Engineers. The City of Sedona Wastewater Department shall administer the construction with assistance from the Design Professional. Contract Documents will be posted on the website along with the RFQ. The successful Proposer will be required to furnish two (2) bonds. One (1) bond, to become effective upon award of the single contract, shall be a Performance Bond substantially in the form attached, and shall be in a sum of one hundred percent (100%) of the contract price including any additions to the Contract. The Bond shall be effective throughout the construction period, including a two (2) year warranty period. The successful Proposer shall also furnish a Labor and Material Payment Bond, substantially in the form attached, to become effective upon award of the single contract. Said Labor and Material Bond shall be in the amount of one hundred percent (100%) of the Contract price. The City of Sedona, Arizona reserves the right to reject any or all SOQ, to waive or not to waive any informalities, or irregularities in the SOQ received, and to accept three (3) SOQ which in its judgment best serves the interests of the City. All questions should be directed in writing to Roxanne Holland, Wastewater Manager, 102 Roadrunner Drive, Sedona, Arizona 86336, or email RHolland@SedonaAZ.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$5,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
131
All Active Projects
56
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 11, 2022

July 13, 2022

img_map_placeholder

To Be Determined, Sedona, AZ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.