BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a medical facility in Birmingham, Alabama. Completed plans call for the construction of a medical facility.

Project number- M.E. JOB #2135 A cashier's check or bid bond payable to Jefferson/Blount/St. Clair Mental Health Authority in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board of General Contractors must be licensed under the provision of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. No bids may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgement, the best interests of the Owner will thereby be promoted. Nonresident bidders must accompany any written bid documents with a written opinion of an attorney at law licensed to practice law in such nonresident bidder's state of domicile, as to the preferences, if any or none, granted by the law of that state to its own business entities whose principal places of business are in that state in the lettering of any or all public contracts. Bonds required by the Contract Documents shall be issued by a Surety Company licensed to do business in the state of Alabama having a bond rating of at least A- according to Best's Key Rating Guide, without reinsurance or other agreements to enhance its rating. Work of this Contract includes selective demolition and renovation of an existing building for a crisis care center for Jefferson, Blount, St. Clair Mental Health Authority. This work will include all necessary mechanical and electrical work, and all construction indicated in the drawings and specified herein

Award

Medical

$4,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
35
Bidding Soon
577
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2021

February 21, 2022

img_map_placeholder

401 Beacon Pkwy W, Birmingham, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.