BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Cheyenne, Wyoming. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

Scope of Work. 1. The work will include but is not limited to the following: a. Remove existing track surfacing from 8 lane oval track, 1 pole vault pad, 2 long jump runways and high jump pad. Long jump and pole vault locations will be switched with each other whereas high jump will be relocated to the east D-zone. Evaluate track for spot repairs, if possible, in leu of complete removal. b. Saw cut, remove areas that have settled, and replace areas of asphalt and subbase as determined by visual inspection before and after oval track and runways surface removal. c. Remove ACO drain system and replace with new concrete curb. Evaluate all drainage issues and make recommendations for improvement. Roll back existing turf +/-20' to expose underground drain connections. Turf is a Hellas matrix H. Contractor to keep warranty of the turf. New curb and high jump pad will need new nailer board. d. Utilize geotextile fabric at areas prone to cracking such as joints, seams, and existing cracks prior to overlay. e. Add East D-Zone to install a new high jump area. Hard surface and surfacing with same material as track. f. Apply a new synthetic track surface that meets or exceeds the specifications of the RSS-3000 system or equal, consisting of a polyurethane bound SBR rubber base mat, non-porous two component polyurethane seal coat and 2, texturized structural spray coats of polyurethane and black colored EPDM rubber, to the entire oval track, 2 runways for long jump, 1 pole vault, and east D-zone which is the high jump pad. Existing turf will need to be protected when track surfacing is installed. Color of track surfacing to be black. Add alternate will be priced for black track and red exchange zones. g. Paint all colored striping on new surfaces as required and to include all lane markings, numbers, directional arrows, start / finish lines etc. for all events currently performed on track. h. Fully warrant entire track of all materials and workmanship for a minimum of 5 years. The Owner reserves the right to waive irregularities and informalities in the proposals or reject any or all proposals without further obligation and to accept any proposals deemed in the best interest of Laramie County School District Number One. The Owner does not bind themselves in any way to accept the lowest cost proposal.

Post-Bid

Playgrounds / Parks / Athletic Fields

$38,670.00

Public - County

Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
19
Bidding Soon
331
All Active Projects
137
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

December 5, 2022

img_map_placeholder

5500 Education Dr, Cheyenne, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.