BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a mixed-use development in Kansas City, Missouri. Completed plans call for the construction of a educational facility.

No other information will be shared publicly until the step-one evaluation is complete. Questions should be directed to Jeff Vandel, Executive Director of Facilities at 816-321-6963. Individuals with special needs as addressed by the Americans with Disabilities Act may contact 816-321-5000. ***We anticipate the aggregate construction budget for these projects to be $90 million to $100 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. North Kansas City Schools is requesting qualifications from firms to provide Construction Manager at Risk (CMAR) with guaranteed maximum price services for a variety of construction projects to include school additions, new facilities, and deferred maintenance The Construction Manager at Risk will be selected using a three-step process: STEP ONE shall consists of the review and ranking of each respective firm's qualifications and responses to the District's selection criteria as stated herein. The District will utilize a review panel to evaluate the offerings and establish a preliminary ranking based on the firms. At least three (3) firms, but no more than five (5) firms with the highest preliminary ranking based on the firm's responses to the selection criteria will be selected by the District's panel for the next step. Upon notification of the short list, the step two documents will be issued to the short-listed firms. STEP TWO shall consist of the short-listed firms submitting their cost proposal including preconstruction services lump sum fee, overhead and profit percentage fee, and the lump sum cost for fulfilling general conditions, insurance, performance and payment bond, in a sealed envelope. The District will publicly open the fee submissions. A CMAR's qualifications will account for 60% of the evaluation, and cost will account for 40% of the evaluation. For evaluation purposes, each percentage fee will be multiplied by an arbitrary $10,000,000 construction budget and added to the lump sum to determine the total aggregate fee. A minimum of two firms with the highest score, based on the formula outlined herein, will be invited to advance to Step Three. STEP THREE shall consist of the Board of Education and/or their designees interviewing a minimum of two (2) firms with the highest aggregate score in a public session. The Board will select the CMAR that submits the proposal offering the best value for the District based on the published selection criteria and on its ranking evaluation.

Post-Bid

Educational

$100,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
38
Bidding Soon
718
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

July 20, 2022

img_map_placeholder

Multiple Locations, Kansas City, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.