Renovation of a water / sewer project in New City, New York. Completed plans call for the renovation of a water / sewer project.
As of 12/17/21 there are 2 addendum available. Please check the ITB on where to access these documents. The scope of the work includes but is not limited to: Removal of the existing original out of service single low-pressure boiler, air separator, the existing original out of service single chiller and all associated piping, pumps, and related electrical services. Remove existing three (3) low pressure boilers and replace with sufficient service. Evaluate the need for high pressure steam and either remove or remove and replace with one (1) high pressure boiler. Remove and replace boiler water treatment system. Remove and replace all associated boiler feed water systems. Remove and replace all site distribution pump packages, valves and controls. Remove and replace cooling towers, condenser water treatment system, and condenser water pump packages. Remove and replace 2 steam absorption chillers with electric centrifugal chillers. Remove and replace chilled water treatment system. Remove and replace domestic hot water heater. Remove and replace all steam to hot water heat exchangers. Remove and replace selected piping as required. Perform repairs to chimney and breeching. Install new chimney liners. Remove and replace emergency generator to support entire Utility Plant operation (heating & cooling) during a power outage. Remove and upgrade with new fuel oil pump packages. Provide new lighting for Utility Plant. Upgrade all electrical control panels. Remove and replace all expansion tanks. Provide new DDC control system for all equipment in the Utility Plant. Abate all asbestos containing materials from the Utility Plant. Trenching and underground utility piping and conduit. Removing of existing concrete equipment pads, slotting of floor, patching and prepping floor. Forming and pouring of new equipment pads. The total Contract Time from the issuance of the Notice to Proceed until the total closeout of the project shall be 720 calendar days. The Contract Time to perform the construction work shall be 450 calendar days from the issuance of the Notice to Proceed to Substantial Completion. The Bid security or deposit required to accompany this Bid is Ten Percent (10%) of the total Bid price in the form of a Certified Check or Bid Bond. Payee to be: Commissioner of Finance, County of Rockland, 50 Sanatorium Road, Building A, 8th Floor, Pomona, New York 10970. Bid bonds/Bid checks will be returned after award of the contract to the successful Bidder or the rejection of all Bids. The Bid of each Bidder shall contain the certification to non-collusive Bidding as set forth in Section 103-d of the New York State General Municipal Law, included in the specifications. Bidders must strictly comply with this requirement. Filing Section 8 Bidding Forms 8.0 to 8.10 of the Contract Documents is mandatory when submitting your Bid for this project.
Post-Bid
Water / Sewer
$250,000.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2022
February 7, 2022
To Be Determined, New City, NY
Related To This Project
New City, NY
Bid Date: Sep 26 2019
New City, NY
Bid Date: Apr 21 2022
New City, NY
--
New City, NY
Bid Date: Jan 03 2022
New City, NY
Bid Date: Jan 12 2023
New City, NY
Bid Date: Jan 10 2023
New City, NY
Bid Date: Jan 10 2023
New City, NY
Bid Date: Jan 10 2023
New City, NY
Bid Date: Jan 05 2023
New City, NY
Bid Date: Jan 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.