BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Beavercreek, Ohio. Completed plans call for site work for a road / highway; road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work for which proposals are invited consists of furnishing all labor, equipment and material for the widening of Factory Road from Creekside Trail to E.J. Nutter Park Drive to three (3) lanes, curb and gutter, storm sewer, an eight (8) foot wide sidewalk along the west side of Factory Road, and all other work as may be necessary to complete the contract in accordance with the plans and specifications. PROJECT DBE GOAL 5 % COMPLETION TIME: 365 CALENDAR DAYS

Award

Roads / Highways

$1,354,261.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
126
Bidding Soon
2,631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

February 14, 2022

Project location map

Factory Rd, Beavercreek, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.